Similar Projects
Replacement of 3 Rooftop Air Conditioning Units at NHV Union Station Building
Alteration
Bidding
New Haven, CT 06519

Rotary Screw Air Compressor for MFG Workshop
Alteration
Bidding
East Haven, CT

HVAC Equipment Preventative Maintenance
Term Contract
Post-Bid
Woodbridge, CT 06525

HVAC Services
Post-Bid
New Haven, CT

Service to the Cooling Tower
Results
Waterbury, CT 06702

Chemical Water Treatment
Results
Waterbury, CT

Hoffman Pentair Enclosure Cooling Air Conditioner Model G280646G100
Post-Bid
Wallingford, CT 06492

SCSU Lyman Center HVAC/Electrical Renovations
Results
$297,348 to $328,646 est. value
New Haven, CT

HVAC Systems Repair and Maintenance Services
Post-Bid
New Haven, CT

Norton School Unit Ventilator Replacement - HVAC Improvement
Results
Cheshire, CT 06410

J045--Sources Sought Facility Repairs West Haven Connecticut
Post-Bid
West Haven, CT 36C24121Q0

HVAC Services
Results
Middlebury, CT 06762

Repair of a Trane Roof Top Model WSC090E4RKA 7.5 Ton Roof Top Unit
Post-Bid
Wallingford, CT

John F. Kennedy Elementary School Classroom HVAC Replacement
Results
Milford, CT 06461

City Hill Middle School (CHMS) Replacement of 3 AHU/CU's
Post-Bid
Naugatuck, CT 06770

Reported 10/29/2021 12:00 AM
Project Title

New Haven Free Public Library On-Call Control System

Physical Address View project details and contacts
City, State (County) New Haven, CT   (New Haven County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $17,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Shall consist of furnishing all material, labor, supervision, tools, supplies and other expenses necessary to provide for the titled project as outlined in SECTION C and/or the BID TABLE. b. It is the Contractor’s responsibility to bring the necessary labor, tools, materials, etc., to the work location. The Contractor must have all the tools necessary to perform its trade daily. The security and protection of all materials, tools and equipment stored at any work location are the sole responsibility of the Contractor. c. Only items listed on the BID TABLE may be invoiced. Appropriate line items relating to equipment shall be stated by the Contractor in the BID TABLE. If the price is not filled in, in the appropriate line item on the BID TABLE, it will not be eligible for compensation. No specialized equipment may be billed without the expressed prior authorization of the Facilities Department. d. Implied Requirements – All services and or supplies not specifically mentioned in this solicitation which are necessary to provide the functional capabilities of the bid shall be included in the unit bid pricing. Contractor shall provide all material and equipment usually furnished with such service, in accordance with Industry Standards. e. All material and equipment furnished shall be new and in excellent condition (refurbished items may be accepted only with prior written authorization from the City). f. The City of New Haven’s interpretation of the General Conditions and Specifications shall be final and binding upon the Contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents