Similar Projects
Path Improvements
Infrastructure
Design
$496,000 est. value
Barboursville, WV

Gimlet Hollow O/P
Demolition, New Construction, Infrastructure
Design
$1,600,000 CJ est. value
Ona, WV 25545

Electric Vehicle Charging Station
Infrastructure
Bidding
$240,000 CJ est. value
Huntington, WV 25701

RFP D/B - 5th Ave Curb Ramps
Infrastructure
Bidding
$729,000 CJ est. value
Huntington, WV 25703

Financing, Development and Construction of a Baseball Stadium
New Construction, Infrastructure
Post-Bid
$1,150,000 CJ est. value
Huntington, WV 25701

Construct Asphalt Pavement
Infrastructure
Post-Bid
$800,000 CJ est. value
Barboursville, WV 25504

Bob Bailey Senior Wellness Center Rebid
New Construction, Infrastructure - 3,500 SF
Results
$2,338,000 CJ est. value
Huntington, WV 25701

Milton Elementary School
New Construction, Infrastructure - 54,508 SF
Results
$23,969,000 CJ est. value
Milton, WV 25541

Heath Creek Slab +2
Demolition, New Construction, Infrastructure
Design
$4,545,000 CJ est. value
Barboursville, WV 25504

RFP D/B - Milton Curb Ramps
Infrastructure
Bidding
$550,000 CJ est. value
Ona, WV 25545

RFQ Contractor - Lower Mud River Levee Protection Project
Infrastructure
Post-Bid
$190,700,000 CJ est. value
Huntington, WV 25701

RFP D/B - Design Build Interior and Exterior Signage and Wayfinding Development
Infrastructure
Results
$8,638 CJ est. value
Huntington, WV 25755

Clearing of 1500 Linear Feet (More or Less) of Property Line Fence at Huntington High School
Infrastructure
Design
$100,000 CJ est. value
Huntington, WV 25701

RFP D/B - Guyandotte Curb Ramps +1
Infrastructure
Bidding
$550,000 CJ est. value
Ona, WV 25545

RFP Design - New Cabins at Beech Fork State Park and Coopers Rock State Forres
Infrastructure
Post-Bid
$300,000 CJ est. value
Barboursville, WV 25504

Last Updated 10/11/2023 12:09 PM
Project Title

Contract #8 - Sanitary Sewer Lift Stations

Physical Address View project details and contacts
City, State (County) Huntington, WV 25705   (Cabell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $3,269,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sanitary Sewer Lift Stations consist of the construction of 15 submersible lift stations together with all valve vaults, access roads, security fencing, and other necessary appurtenances for the access, operation, and security of the stations. The contract also includes the installation of pumps and electrical controls provided by the Vendor of Contract #9 - Lift Station Pumps and Controls, and manholes, gravity sewer mains, force mains and other appurtenances as needed in order to connect the lift stations with new gravity sewer mains to be installed by others. Contractors are required to comply with all laws pertaining to prevailing wage rates for the State of West Virginia as issued by the Division of Labor and the federal wage rates issued in accordance with the Davis Bacon Act. The contractor will be required to pay the higher of the state or federal wage rates appropriate for each worker classification. Contract #8 - 540 calendar days after the date when the Contract Times commence to run and ready for final payment within 600 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000 per day. Bids shall be accompanied by a certified check or bid bond payable to Pea Ridge Public Service District in an amount equal to five percent (5%) of the base bid. All Bidders are required to have a West Virginia Contractor's License per Section &30-42-12 of the West Virginia Code QA Deadline September, 29, 2023

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents