Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

RFP - Design and Engineering Services During Construction for Snapfinger Advanced Wastewater Treatment Facility Expansion - Phase 3A Project (Multiyear Contract)
Term Contract
Bidding
Decatur, GA 30034

RFQ Design - Professional Architectural and Engineering Design Services for Dresden Elementary School Replacement
Demolition, New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Atlanta, GA 30341

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Construct Wastewater Metering Station
New Construction
Design
$100,000 to $250,000 est. value
Decatur, GA 30033

RFQ Design - Architectural / Engineering Services for Dresden Elementary School Replacement
Demolition, New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Atlanta, GA 30341

Engineering, Planning and Development
Post-Bid

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

RFQ - On-Call Engineering Services
Term Contract
Bidding
Tucker, GA 30084

Project Management Services
Term Contract
Post-Bid
Tucker, GA

Architect-Engineer Supplemental Services - Southeast Regional Office
Results

Last Updated 10/21/2022 08:09 AM
Project Title

RFP - Bike Pedestrian Trail Plan

Physical Address View project details and contacts
City, State (County) Lithonia, GA 30058   (DeKalb County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Monday, October 31, 2022 Deadline for Questions at 5:00pm Sealed Proposals for Purchasing RFP 2022-013 Bicycle, Pedestrian, and Trail Plan (hereinafter referred to as "Request for Proposal" or "proposals"). Procurement will be received by the City of S t o n e c r e s t , hereinafter called "City." Service providers whose qualifications meet the criteria established in the Request for Proposal, at the sole discretion of the City, may be considered for Contract award. The City may, by direct negotiation, finalize terms with the service provider who is selected for award based on proposals. The City reserves the right to reject any or all responses for any reason. Clarification of information may be requested by the city. The City, at its sole discretion, may short-list firms that are deemed to best meet the City's requirements, taking into consideration all criteria listed in the RFP. The City may, at its sole discretion, ask for formal presentations from all of the responsive and responsible proposers, or only from those firms that are short-listed, if short- listing is determined to be in the best interest of the City. Negotiations will be conducted and may take place in person or via telephone with the most qualified firm as identified by the City or, if shortlisting occurs, with all of the short-listed proposers. Proposers that participate in the negotiations may be given an opportunity to submit their best and final offers. The City of Stonecrest requires pricing to remain firm for the duration of the contract. Failure to hold firm pricing for the duration of the contract will be sufficient cause for the City to declare a proposal non-responsive. No Proposal may be withdrawn for a period of ninety (90) days after the time and date scheduled (or subsequently rescheduled) for proposal opening. The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents