Similar Projects
Water System Hydraulic Model
Bidding
Boston, MA

Furnish and Deliver Water Meters
Bidding
$350,000 est. value
Needham, MA

Fire Alarm and Sprinkler System Maintenance and Repair Services
Post-Bid
Less than $202,500 est. value
Brookline, MA

Installation of 6-Inch to 10-Inch Cement Lined Ductile Iron Water Mains
Post-Bid
Less than $1,400,000 est. value
Plainville, MA 02762

Canton Street Water Main
Results
Less than $1,200,000 est. value
Dedham, MA

Water Shut-Off Valves Replacement
Results
Less than $35,000 est. value
Wellesley, MA 02481

Low Service Pressure Reducing Valve Improvements
Bidding
$11,200,000 est. value
Boston, MA

Washington Street and Bugbee Street Water Main Improvements
Post-Bid
Plainville, MA 02762

Miscellaneous Water and Sewer Supplies
Term Contract
Results
Less than $300,000 est. value
Needham, MA

Replacement of Lead Services
Bidding
$999,437 est. value
Boston, MA

Holliston and Brentwood Street Water Main Improvements - Contract 2
Post-Bid
Less than $2,600,000 est. value
Medway, MA 02053

Lincoln Street Waterline Improvements
Results
Less than $1,292,535 est. value
Franklin, MA 02038

Renewing Approximately 60 Water Services
Bidding
Less than $700,000 est. value
Bellingham, MA

Holliston and Brentwood Street Water Main Improvements - Contract 1
Post-Bid
Less than $3,200,000 est. value
Medway, MA 02053

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 08/19/2020 10:01 AM
Project Title

2020 Water Main Improvements Contract 1

Physical Address View project details and contacts
City, State (County) Canton, MA   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of removing existing 6-inch water main and installing approximately 11,000 feet of 8-inch ductile iron water main and appurtenances on Dedham Street, Elm Street, and Green Lodge Street. The new water main work will also include new hydrants and new services. Surface restoration work includes permanent trench patching on Dedham Street and on Green Lodge Street and pavement overlay on portions of Elm Street. The project also includes temporary by-passing piping and services on Elm Street and Green Lodge Street. Bid alternate includes construction and installation of a precast three-sided concrete box culvert and associated work on Elm Street.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents