Similar Projects
Northside Pedestrian Upgrades
Infrastructure
Bidding
$45,000 est. value
La Crosse, WI

Annual Highway Materials
Term Contract
Post-Bid
West Salem, WI

20th and 21st Madison Street - Reconstruction
Post-Bid
La Crosse, WI 54601

Lacrosse - Westby, Brickyard Lane to CTH M
Results
La Crosse, Westby, WI 54602

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Curb and Gutter with Utilities
Post-Bid
La Crosse, WI 54603

City of Lacrosse, Gillette Street, Caledonia Street to George Street (STH 35)
Results
La Crosse, WI

Seal Coat
Infrastructure
Post-Bid
La Crosse, WI 54601

Village of Holmen, CTH SN, Hanson Road to Alpine Lane
Results
Holmen, WI

2022 Pavement
Infrastructure
Post-Bid
Onalaska, WI

East Main Street at Green Coulee Road Intersection
Results
Onalaska, WI 54650

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Pettibone Drive South Reconstruction
Results
$300,000 est. value
La Crosse, WI 54601

Front Street- Vine Street to La Crosse River
Infrastructure
Post-Bid
$401,200 est. value
La Crosse, WI 54601

2021 Curb and Gutter
Results
$50,000 est. value
La Crosse, WI 54601

Reported 06/28/2022 03:24 PM
Project Title

Rehabilitation Taxiway B - City of La Crosse

Physical Address View project details and contacts
City, State (County) La Crosse, WI 54603   (La Crosse County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected September 2023
Bids Due View project details and contacts
Estimated Value $2,650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate Taxiway B to extend the useful life of this airfield pavement. As of June 27, 2022, an engineer has not been selected and a firm timeline for construction has not been determined. This project is currently in the FY 2022-2026 CIP an funding is allotted for 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Airline/Passenger Terminal, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents