Similar Projects
Jackson Creek Road Improvements
Term Contract
Design

GAOA Jackson Creek Road Improvements
Infrastructure
Bidding
$250,000 to $500,000 est. value
Bozeman, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area
Infrastructure
Post-Bid
Belgrade, MT 59714

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Seal and Cover, Guardrail, Pavement Markings on the Three Forks
Infrastructure
Post-Bid
MT

Hudson Bay Divide South
Infrastructure
Results

Scrub Seal VC Hill Bozeman Area
Alteration
Post-Bid
Bozeman, MT

Overlay and Chip Seal Madison Frontage Road and Two Dog Road Bozeman Area
Infrastructure
Results
Silver Star, MT 59751

Scrub Seal Big Sky South Bozeman Area
Alteration
Post-Bid
Bozeman, MT

Overlay and Chip Seal Frontage Rd W of Columbus Billings Area
Infrastructure
Results

Overlay and Chip Seal Lodgepole Road Kalispell Area
Alteration
Post-Bid

Scrub Seal Hwy 10 E Se of Greycliff Interchange Billings Area
Infrastructure
Results

2022 Gallatin County RID Paving and Road Maintenance Project
Infrastructure
Post-Bid
$1,100,000 est. value
Bozeman, MT

Last Updated 04/25/2022 07:11 AM
Project Title

Overlay and Chip Seal Bozeman Northeast and Bridger Canyon Road Bozeman Area

Physical Address View project details and contacts
City, State (County) Bozeman, MT 59718   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Overlay and Chip Seal Bozeman Northeast and Bridger Canyon Road Bozeman Area. provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 14,000.0 tons of ¾” Commercial Plant Mix Grade S 64-28 asphalt mix material. The overlay shall be paved .15 feet thick and approximately 32 feet wide. Contractor will be required to mill approximately 150 feet at .15 feet deep at the beginning and end of the project limits in Site 1, which includes milling at each end of one bridge at MP 3.313. Total milling is approximately 720 feet. Contractor shall provide all labor, equipment, materials, traffic control and incidentals necessary to produce, haul, place, roll and broom approximately 259,072.0 square yards of laid-in-place chip seal. The chip seal will be approximately 13.98 miles long and 32 feet wide. Included with-in the chip quantities is one pullout at MP 14.3 is roughly 40 feet x 400 feet. Contractor shall provide CHFRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light Site 1: Overlay & Chip Seal Project Site: Bozeman Northeast Route: c000086n Milepost: 2.282 To 9.58 Site 2: Chip Seal Project Site: Bridger Canyon Road Milepost: 9.58 To 15.8 Item & Description Unit of Measure Quantity Mobilization L.S. 1.0 ¾” Commercial Plant Mix-Grade S PG 64-28 Ton 14,000.0 Cold Milling (avg. depth .15’) S.Y. 720.0 Type 1 Chips S.Y. 128,922.0 Liquid Emulsified Asphalt Grade CHFRS-2P Ton 238.0 Traffic Control L.S. 1.0

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents