Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

2nd Street Water and Roadway Improvements
Alteration
Bidding
$1,150,000 to $1,200,000 est. value
North Bend, WA

DLS Roads Maintenance Management System
Term Contract
Bidding
WA

Transit Facility Improvements Work Order
Infrastructure
Post-Bid
WA

150Th Ave Se / Se 38Th St To Eastgate Way - Roadway Improvements
Infrastructure
Post-Bid
Bellevue, WA

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

Brickyard to SR 527 Improvements
Term Contract
Design
Bothell, WA 98011

Playground, Asphalt, and Field Improvements at Bagley Elementary School
Renovation
Bidding
Seattle, WA 98103

West Valley Highway (Strander Boulevard to I-405)
Infrastructure
Post-Bid
$3,400,000 to $4,000,000 est. value
Tukwila, WA

124th Avenue NE- NE 12th Street to NE Spring Boulevard
Infrastructure
Results
$8,221,853 est. value
Bellevue, WA 98007

Mardi Gras Waste Lines
Infrastructure
Bidding
$230,000 est. value
Kent, WA 98030

UST Inspect Maintain and Repair
Alteration
Post-Bid
$1,000,000 est. value
WA

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Results
WA

Reported 04/20/2022 12:00 AM
Project Title

2022 Valve and Manhole Adjustment Project

Physical Address View project details and contacts
City, State (County) Bothell, WA   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $325,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed for this project consists of the replacement and adjustment of sewer manhole covers and water valve box assemblies (with associated roadway restorations), pavement patch repairs, and roadway planning and overlays

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents