Similar Projects
Resurfacing/Base Work/Drainage Improvements
Bidding
$18,232,331 est. value
FL

Restore Maintenance Road GATR Site
Post-Bid
Panama City, FL

Repair Restore Expeditionary Road
Post-Bid
Panama City, FL 32403

Hugh Thomas Drive Improvements
Results
Callaway, FL 32404

Widen/Resurface Existing Lanes/Sidewalk
Results
Less than $505,626 est. value
FL

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Roadway Repairs
Results
Less than $980,825 est. value
Lynn Haven, FL

City-Wide Street Repairs
Post-Bid
Mexico Beach, FL

Roadway Repairs
Results
Less than $520,705 est. value
Callaway, FL

Front Beach Road Segment 4.1 Powell Adams
Post-Bid
Panama City Beach, FL 32413

Veal Road Dirt Road Stabilization Project
Results
Panama City, FL 32401

FY19 Annual Resurfacing Phase 2 Collector Roads
Results
Panama City, FL 32401

Safety Project/Add Turn Lanes/Traffic Signals/Drainage Improvements
Results
Less than $265,041 est. value

FY20 Annual Resurfacing Phase 2 CR388
Term Contract
Results
FL

Paving Survey
Results
Panama City, FL 32403

Last Updated 04/29/2021 04:24 AM
Project Title

S. Silver Lake Road and Silver Lake Road - Dirt Road Stabilization Project

Physical Address View project details and contacts
City, State (County) FL 32438   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors for the stabilization of S. Silver Lake Road and pavement construction of Silver Lake Road. The project limits will include approximately 1.012 miles of S. Silver Lake Road from Cowels Road northward to Silver Lake Road and approximately 1.297 miles of Silver Lake Road eastward from S. Silver Lake Road to just east of Deep Springs Road. The combined total project length is approximately ±2.309 miles. The project area will be stabilized with asphaltic concrete pavement, sod, rubble rip-rap stabilization, and providing adequate roadside shoulders and swales for the treatment and conveyance of stormwater runoff. The project will also include the replacement of select existing drainage structures (side drains and cross drains).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents