Similar Projects
Hickory Creek Interceptor I & II
Bidding
Denton, TX

Parallel Pipeline From Taylor Regional WTP to Stonehill Pump Station Proposal Package 9 Tunnel Install (East)
Post-Bid
Lewisville, TX 75057

Parallel Pipeline From Taylor Regional WTP to Stonehill Pump Station Proposal Package 8 Tunnel Install (Center)
Post-Bid
Lewisville, TX 75057

Harvest Townside Phase 2 Utilities
Results
TX

Onsite Water, Sanitary Sewer and Storm Drainage and Offsite Water and Sanitary Sewer Improvements for Aspen Meadows Phase 1
Results
Denton, TX 76201

Parallel Pipeline From Taylor Regional WTP to Stonehill Pump Station Proposal Package 7 Tunnel Install (West)
Post-Bid
Lewisville, TX 75057

CDBG Morningside Sanitary Sewer Manhole and Main Line Replacement
Results
$543,737 est. value
Lewisville, TX 75057

Wildridge Phases 5A and 5B - Wet Utilities
Post-Bid
Oak Point, TX 75068

2019 Southside Sewer Collection System Repairs
Results
Northlake, TX 76226

Liberty Trails - Phase 1B Water, Sewer, and Drainage Improvements
Post-Bid
TX

Construction of Water, Sanitary Sewer, Drainage, and Paving Improvements for Big Sky Estates Phase 1
Results
$7,174,000 est. value
Denton, TX 76201

Lift Station & Force Main for Big Sky Estates Phase 1
Post-Bid
Denton, TX 76201

2019 Water and Sanitary Sewer Improvements
Results
$342,481 est. value
Aubrey, TX

Water, Sanitary Sewer, and Storm Sewer Improvements for Pecan Square 2B-2
Post-Bid
TX

Construction of Water and Wastewater Infrastructure for Big Sky Estates Phase 1
Results
Denton, TX 76201

Last Updated 04/07/2021 04:18 PM
Project Title

Harvest Phase 8A Utilities

Physical Address View project details and contacts
City, State (County) TX   (Denton County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 2,600 LF sanitary sewer, 2,800 LF of water, and2,000 LF of storm sewer for 91 residential lots.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents