Similar Projects
Rockford Beach - Engineered / Asphalt Drive/ Parking - Jefferson County
Infrastructure
Conception
$250,000 CJ est. value
Hillsboro, MO 63050

Rockford Beach - Engineered / Asphalt Drive/ Parking - Jefferson County
Infrastructure
Conception
$250,000 CJ est. value
Hillsboro, MO 63050

O'Reilly Auto Parts (HBR) / Hillsboro
New Construction, Infrastructure
Design
$400,000 CJ est. value
Hillsboro, MO 63050

Vault Restrooms-Kimmswick
New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Imperial, MO 63052

2023 - Subdivision Pavement Surface Preservation and Crack Seal
Infrastructure
Bidding
$225,000 CJ est. value
Hillsboro, MO 63050

District Parking Lot Improvements
Renovation
Post-Bid
MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Cherry Lane Improvements project
Infrastructure
Results
Festus, MO

Old Lemay Ferry Road Intersection Improvements
Infrastructure
Results
MO

James Hardie Manufacturing Facility
Demolition, New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Festus, MO 63028

Heartland Residential
New Construction, Infrastructure
Pending Verification
$137,000,000 CJ est. value
Hillsboro, MO 63050

Lighting improvements at various locations
Infrastructure
Bidding
$2,500,000 CJ est. value
Hillsboro, MO 63050

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

East Rock Creek Road
Infrastructure
Results
MO

Open Door Animal Sanctuary Welcome Center
New Construction, Infrastructure
Pending Verification
$255,000 CJ est. value
House Springs, MO 63051

Last Updated 03/31/2023 02:02 AM
Project Title

2023 - Rebid HIGH RIDGE BLVD SHARED USE PATH

Physical Address View project details and contacts
City, State (County) High Ridge, MO 63049   (Jefferson County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,647,373 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes: A shared use concrete path will be constructed with lighting, contrasting concrete stamped buffer, curb and gutters, storm sewer inlets with closed drainage pipe structures, and cross walk facilities. The typical shared use path pavement cross section shall include a 7' wide concrete shared use path, 3' wide stamped brick buffer strip, 4.5' wide curb and gutter, and a saw cut to define a clean the existing shoulder on High Ridge Boulevard. A cross walk will cross High Ridge Boulevard at Community Lane to provide pedestrian and bicycle access from the shared use path to High Ridge Elementary School. Street lighting will provide ambient light for both High Ridge Boulevard and the shared use path using decorative multi globe light standards on poles. The total project length is 4,505 ft. Work shall be in accordance with the provided Specifications, Job Special Provisions, and Plans. Where not specifically covered by the Specifications, or Job Special Provisions or Plans, the Contractor shall adhere to the currently effective 2023 Edition of the "Missouri Standard Specifications for Highway Construction", and the currently effective "MoDOT Standard Plans for Highway Construction." The contractor shall have a maximum of One Hundred Sixty ( 160) Working days to complete the project, or a Completion Date of December 31, 2024 - whichever shall come first. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work, of a similar character in this locality, as established by the Department of Labor and Industrial Relations (Federal Wage Rate) or state wage rate, whichever is higher. Jefferson County, Missouri hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2023 Edition. The contractor questionnaire must be on ~i~e 7 days prior to bid opening. Contractors and sub-contractors who sign a contract to work on any public works project must provide a minimum 10- Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. A cashier's check or bid bond in the amount of 5% shall be submitted with each proposal. A certificate of insurance shall be submitted with each proposal. All bids shall be made on the forms provided. Three (3) copies of the bid must be submitted, one (1) being original inked. Jefferson County, Missouri reserves the right to reject any or all bids, to waive any informality in the bids received, and to award the contract to the lowest, responsive, responsible bidder ,with MoDOT concurrence. The DBE goal for this project is 10 %

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents