Similar Projects
Lift Station System Replacement
Results
Irving, TX 75062

Lawson Road Lift Station In-Line Flow Storage Basin
Results
Dallas, TX 75253

Danieldale Pump Station Rehabilitation - Phase 1 Construction
Results
Duncanville, TX 75137

High Service Pump Station Pumping Unit Replacement
Results
Dallas, TX 75235

Addison Kellway Lift Station By-Pass Project
Bidding
Addison, TX 75001

DCRRD Pump Station Upgrade Project 2020
Results
Carrollton, TX 75010

Fireside by the Lake, Phase 1 - Lift Station Improvements
Bidding
Dallas, TX 75295

Ard Road Pump Station Upgrades Contract 1
Post-Bid
$150,000 est. value
Seagoville, TX 75159

Gillion Pump Station Improvements Electrical Upgrade
Results
$585,000 est. value
Dallas, TX 75200

Walcrest Pump Station and Walnut Hill Pump Station Site and Security Improvements
Results
$1,819,744 est. value
Dallas, TX 75201

Matthew Holzapfel Pump Station
Results
Less than $12,745,860 est. value
Mesquite, TX

Rowlett Road Lift Station Upgrades
Results
$442,350 est. value
Rowlett, TX 75030

Sherwood Wastewater Lift Station (Various Locations)
Results
Cedar Hill, TX 75104

Highland Park Meter Station Rehabilitation
Results
$313,800 est. value
Highland Park, TX 75205

Southwest Sector Pump Station - Phase 2
Results
$8,000,000 to $9,000,000 est. value
Grand Prairie, TX 75050

Last Updated 02/04/2021 10:04 AM
Project Title

Robinson Road Pump Station

Physical Address View project details and contacts
City, State (County) Grand Prairie, TX 75050   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,615,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project includes furnishing all labor, material, equipment and performing all work required for the Robinson Road Pump Station, consisting of a 13.3 MGD pump station with three horizontal split case pumps and a fourth open stall for expansion of the pump station to 20 MGD. Also included in this project are a generator and screening wall, approximately 650 LF of 30” yard piping, and necessary electrical/site work.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents