Similar Projects
Last Updated | 09/21/2022 09:40 AM |
Project Title | Snow Removal Housing Petoskey Street |
Physical Address | View project details and contacts |
City, State (County) | Petoskey, MI 49770 (Emmet County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Must have the necessary equipment, supplies, and materials to accomplish the task of snow removal services at 910 and 912 Petoskey St., Petoskey, Michigan (Multi Family Apartments). Equipment must be in working order to accomplish the contract obligations. B. While on site, in person contact adhere to the LTBB social Distancing guidelines and Covid Protocols. C. Plow or blow the main driveway leading to the building, drives leading to each entry, parking area and trash collection areas. D. Plow snow when there is an accumulation of three (3) inches or more. Plowing shall be done once per day, unless a significant amount of snowfall occurs. If such action occurs, the Contractor will only plow after the significant snowfall stops. E. Clear snow from the main sidewalk leading to the building, main entrance to building and porch area to each apartment main entry. F. Salt and/or sand, as needed, the main driveway, walkways, parking areas, sidewalks, entries, porches and common areas. G. Must maintain salt and/or sand, on regular basis even when no accumulation has occurred, the main driveway, walkways, parking areas, sidewalks, entries and common areas. H. Work with LTBB Housing Department to schedule when services are provides so parking and obstacles can be removed I. Properly place the snow or remove it to minimize loss of parking space. J. If snow encroaches on driveways, parking, sidewalks, and/or hinders line of sight, load and remove dispose of off property. K. Available for plowing all addresses from November 1, 2022 through April 30, 2023. L. Observe all applicable prescribed safety regulations and practices (see Appendix "A"). M. Contractor will be responsible to make turf, parking lot, and sidewalk and curb repairs in areas where Contractor's equipment damages said areas. N. Contractor is responsible for any damages to LTBB or neighboring property caused by Contractor or Contractor's equipment that may occur during the fulfilment of this contract |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |