Similar Projects
Gulfstream Aerospace Service Center
New Construction - 160,000 SF
Design
$10,000,000 CJ est. value
Fort Worth, TX 76177

Upt 2.5 Hanger 12 & 64 Renovation
Renovation
Design
$100,000 to $250,000 est. value
Randolph, TX

CommutAir Hanger Renovation
Renovation - 3,108 SF
Bidding by Invitation
$600,000 est. value
Houston, TX 77032

Hangar Construction
New Construction
Post-Bid
Sherman, TX 75090

Aircraft Hangar Hydraulics System Repair, Redesign and Service
Post-Bid
San Antonio, TX 78236

4540 Glenn Curtiss - Hangar T5 Repairs
Renovation
Results
$50,000 to $80,000 est. value
Addison, TX 75254

T-Hangars Replacement of Row A and New Row E at Bay City Regional Airport
Results
Bay City, TX 77414

Braniff Hangars Phase II
New Construction - 49,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Dallas, TX 75209

McKinney Airport Hangars
New Construction
Construction
McKinney, TX 75069

Aviation Box Hangar - Mid-Way Regional Airport
Post-Bid
Midlothian, TX 76065

Sugar Land Regional Airport Hangar
New Construction - 40,000 SF
Results
$8,000,000 est. value
Sugar Land, TX 77498

Galaxy East Hangar Build Out
Renovation - 2,700 SF
Construction
$200,000 est. value
Houston, TX 77061

Palacios Municipal Airport Box Hangar Project
Post-Bid
Palacios, TX 77465

Mccampbell-Porter Airport
Results
Less than $514,000 est. value
Aransas Pass, TX 78336

Thomas Airport Hangar Maintenance
Post-Bid
Sinton, TX 78387

Last Updated 12/29/2020 10:42 AM
Project Title

Construct Hangar at Cold Springs

Physical Address View project details and contacts
City, State (County) Fort Hood, TX 76544   (Bell County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor is required to provide all plant, supervision, labor, materials, equipment, supplies, and transportation necessary to complete the scope of work for this project. Except as provided elsewhere in this contract, all work shall be comply with applicable, State, Local, and Federal laws, rules, and regulations, industry & construction codes and standards, manufacturer’s specifications & recommendations, and all contact special provisions, terms, and conditions. The Contractor shall be responsible for obtaining all required licenses and permits to perform construction work on a Federal installation, be properly bonded and insured in accordance with FAR requirements. The work consist of new construction contract to Y. The anticipated date of completion of this construction project is 210 calendar days from date of notice to proceed. Completion is defined as satisfactory completion of all work described in the scope of work and or approved plans and drawings in a timely manner, to include other contractual obligations identified as close out documentation, final testing, inspection and acceptance.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents