Similar Projects
LS 48 and Forcemain
New Construction
Bidding
$3,000,000 est. value
Grand Forks, ND

Facility Expansion
New Construction
Bidding
$6,000,000 est. value
Thompson, ND

West End Lift Station Improvements
New Construction
Post-Bid
$150,000 to $250,000 est. value
Valley City, ND

Master Lift Station Improvements
New Construction
Post-Bid
$150,000 to $250,000 est. value
Valley City, ND

GSR and Pump Station Replacement
Results
$1,200,000 est. value
Cavalier, ND

Fargo Red River Pump Station Improvements
Renovation
Results
$5,500,000 est. value
Fargo, ND

Storm Sewer and Sanitary Lift Station
Infrastructure
Bidding
$4,000,001 to $4,500,000 est. value
Mandan, ND 58554

UND Aerospace Apron Reconstruction Phase 2
Renovation, Alteration
Post-Bid
Grand Forks, ND 58202

Leachate Forcemain and Lift Station
Results
$801,000 est. value
Dickinson, ND

Lift Station Repl/Rehab
Renovation
Bidding
$2,000,000 est. value
Fargo, ND

3rd Street Lift Station Improvements
Renovation
Post-Bid
$200,000 est. value
Grafton, ND 58237

Upgrade Lift Station 12 and Lift Station 13
Renovation
Results
$775,000 est. value
Grand Forks, ND

Lift Station Improvements
Renovation
Results
$800,000 est. value
Jamestown, ND

Sewer Improvement District No. 2019-1
Results
$5,000,000 to $5,400,000 est. value
Kindred, ND

Velva Goldade Lift Station Replacement
Renovation
Results
$400,000 to $500,000 est. value
Velva, ND

Last Updated 05/27/2022 02:32 AM
Project Title

Woodcrest Flood Risk Management Project

Physical Address View project details and contacts
City, State (County) Fargo, ND   (Cass County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,960,903 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Nature & Scope This project is for the construction of a new storm sewer lift station and earthen levee in the Woodcrest neighborhood located along North and South Woodcrest Drive North. Purpose This project has been identified as being necessary to allow the proposed 1% annual chance flood level (37-foot river gage height) to pass through Fargo, without any emergency measures, once the Fargo-Moorhead Diversion Project (Diversion) is completed. Prior to the Diversion being completed, this project will also reduce the need for emergency levees during spring flood events.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents