Similar Projects
New A/C Unit for Ft Dodge
Renovation
Design
$100,000 CJ est. value
Anamosa, IA 52205

Improve Terminal Building (Upgrade HVAC System Controls)
Renovation
Sub-Bidding
$500,000 CJ est. value
Waterloo, IA 50703

Cyride 2023 HVAC Improvement Project
Renovation
Sub-Bidding
$500,000 CJ est. value
Ames, IA 50011

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Ho-Chunk to Heritage Parking Ramp Skywalk Upgrades
Alteration
Post-Bid
Sioux City, IA 51101

Mitsubishi HVAC Cassette Units
Alteration
Results
Cedar Rapids, IA

West Elementary and Junior and Senior High School HVAC Upgrades
Alteration
Results
Independence, IA 50644

Hawthorne Elementary HVAC Upgrades
Alteration
Post-Bid
Keokuk, IA 52632

Skywalk HVAC Replacement Phase 4
Alteration
Results
Less than $150,000 est. value
Des Moines, IA

Laboratory Freezer
Alteration
Post-Bid
Davenport, IA

Marion High School HVAC Upgrades
Alteration
Results
Marion, IA 52302

Washington CSD High School Mechanical Upgrades
Alteration
Post-Bid
Washington, IA 52353

Fort Dodge Cooper Elementary HVAC Renovation
Renovation, Alteration
Results
Fort Dodge, IA

Water System Improvements
Term Contract
Post-Bid
Storm Lake, IA 50588

Boone CSD High School HVAC Upgrades
Alteration
Results
$2,300,000 to $2,600,000 est. value
Boone, IA 50036

Last Updated 02/24/2023 03:25 PM
Project Title

Southwest Valley High School Boiler and Gym HVAC Replacement

Physical Address View project details and contacts
City, State (County) Corning, IA 50841   (Adams County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Bids shall be submitted for a single contract that will include the following: Project consists of demolition of one (1) existing gas-fired hot water boiler, two (2) heating water circulation pumps, one (1) heating only air handling unit (AHU), gas piping, heating water piping, flue piping, supply and return ductwork, electrical connections, transformer, and controls. Existing boiler will be replaced with two (2) new gas-fired, condensing boilers. Existing pumps will be replaced with new base mounted end suction pumps. Existing AHU will be replaced with new indoor AHU with hydronic heating and split direct expansion (DX) air cooled condensing unit for cooling. Existing piping and ductwork will be extended to serve new equipment. Condensing Units, Air Handling Units, Boilers, and Pumps have been pre-purchased by the Owner. Commencement of the Work on the project shall begin immediately after award of contract. TIME OF COMPLETION: The Bidder shall state on the Proposal Form the date the Bidder guarantees completion of the project. Project shall be completed by August 4, 2023 . BID FORM: Bids shall be submitted in duplicate on forms issued by the Architect. BID SECURITY: Bid security in the amount of five percent (5%) of the bid must accompany each bid in accordance with the Instructions to Bidders. WAGE RULES: Contractor agrees to comply with the provisions of the Davis-Bacon Act in force at the time of construction, regarding wages paid by it and by subcontractors used by it under this Project. The prevailing rate of wages are revised by the Department of Labor and are available on the Department's official website.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents