Similar Projects
East West Connector Roadway Safety Improvements - 2-217 - City of Smyrna
Infrastructure
Conception
$2,170,000 est. value
Smyrna, GA 30082

Windy Hill Parkway Improvements - 2-218 - City of Smyrna
Infrastructure
Conception
$1,230,000 est. value
Smyrna, GA 30080

Valvoline / Atlanta
New Construction - 2,088 SF
Design
$2,000,000 est. value
Atlanta, GA 30339

Noonday Creek Trail Extension FM SR 92 to Noonday Creek Park
Infrastructure
Design
Kennesaw, GA 30144

Street Resurfacing
Infrastructure
Bidding
$8,000,000 est. value
Kennesaw, GA

FY2023 Resurfacing Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Smyrna, GA 30080

Dekalb Avenue Safety Improvements
Post-Bid
GA

Truck Bay Asphalt Repaving Project at Marietta Power and Water Warehouse
Infrastructure
Post-Bid
Marietta, GA 30060

Third Army Road Area Infrastructure Improvements
Results
Less than $2,800,000 est. value
Acworth, GA 30101

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

Enterprise Rent-A-Car
Renovation - 2,523 SF
Construction
Marietta, GA 30064

Strickland Brothers 10 Minute Oil Change
New Construction - 1,725 SF
Construction
$950,000 est. value
Kennesaw, GA 30152

Auto Repair/Retail Building
New Construction - 7,200 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Austell, GA 30168

Valvoline Instant Oil Change
New Construction - 2,088 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Marietta, GA 30062

Windy Hill Road ADA Upgrades Project
Infrastructure
Bidding
$400,000 CJ est. value
Smyrna, GA 30080

Last Updated 08/01/2022 04:32 PM
Project Title

Yamaha Motor Corporation Expansion

Physical Address View project details and contacts
City, State (County) Kennesaw, GA 30144   (Cobb County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 5,584 square foot building addition. As of April 18, 2022, this project is seeking site plan approvals from Cobb County. The next meeting is scheduled for April 21, 2022. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed, but construction could begin in fourth quarter 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents