Similar Projects
Last Updated | 10/10/2023 03:10 PM |
Project Title | SMD Services IDIQ Contract for Asbestos Floor Tile Abatement in Vacant Apartments Citywide With Borough Focus |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 10462 (Bronx County) |
Category(s) | Single Trades |
Sub-Category(s) | Finishes/Interior |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work shall consist of furnishing all labor, material, equipment and supplies, as required, to effectively and completely fulfill the Contract requirements, as specified: a. Removal and disposal of all layers of vinyl floor tiles including mastic, and any other floor covering (such as resident applied vinyl self-stick tiles, carpets, ceramic tiles, linoleum, wood flooring, etc.), cove base and baseboard in the abatement area at various Citywide Developments. The scope involves asbestos abatement under large project procedures as defined by the NYCDEP. b. Abatement projects are to be filed with a DEP approved (specific for NYCHA properties) variance. c. Variance documents, for the floor tile removal, can be found in the Appendix to this Specification for: i. VAT removal - under the variance, work shall be performed in two phases. The variance request involves the installation of a modified three (3) chamber decontamination unit for Phase I (in the abatement of approximately 60-80 square feet), followed by converting to a five (5) chamber worker decontamination unit for Phase II where the remaining asbestos abatement is to be completed. ii. Mastic removal - removal of the bottom layer (on the concrete slab) shall be accomplished by use of mechanical equipment and a variance from the DEP-approved procedures. B. At times, the Contractor will be required to perform asbestos abatement related to emergency operations encountered by NYCHA. The work authorizations may require work to be performed during holidays and/or weekends. C. Air monitoring shall be performed by an independent third-party entity engaged by the NYCHA. The Contractor shall coordinate all the abatement work with the air monitoring firm, Development Management and the Contract Coordinator. D. The Contractor is required to file the work with the NYCDEP, NYSDOL, and the EPA. Pre-bid meeting info : Option 2: Call in (audio only) +1 646-838-1534,,189010969# United States, New York City Phone Conference ID: 189 010 969# Option 3: Access the attached document "TEAMS Meeting Link RFQ 378898- 378901" and click on the embedded link to join. RFQ Question Submission Deadline 7/12/22 at 2:00PM Question and Answer Release Date 7/15/22 at 2:00PM |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |