Similar Projects
Reported | 10/13/2021 12:00 AM |
Project Title | Continuing Professional Engineering Design Services |
Physical Address | View project details and contacts |
City, State (County) | FL (Orange County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Consultant shall provide final engineering design and construction plan preparation for the Horizon West Trail Phase I from the existing trail along Tiny Road to the existing Horizons West Trail at Winter Garden Vineland Road. The project consists of the design of a 10 to 14-foot-wide asphalt / concrete pavement multi use trail that shall connect an existing 10-foot concrete multi-use trail along Tiny Road to the existing Horizon West Trail at Winter Garden Vineland Road. The total length of the trail is approximately 2.23 miles. This trail will serve as an important connection in the Orange County regional trail system. The trail travels north along Tiny Road ROW to Tilden Road where it joins the SR 429 ROW easement north to Winter Garden Vineland Road/CR 535. The intersection of Tiny Road and Tilden Road is currently under design and coordination might be needed to either upgrade or connect to this project including the necessary upgrades to the new signalized intersection crossing. Refer to the attached exhibit for the trail conceptual alignment Phase I. The total project length is approximately 2.23 miles. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |