Similar Projects
Fort Hill Bridge Removal, Stream Restoration and Route 15 Wildlife Passage Project
Construction
Less than $141,902 est. value
Williston, VT 05495

Crystal Lake Dam Improvements
Results
Barton, VT

Dunklee Pond Dam Removal
Demolition
Post-Bid
Rutland, VT 05701

Maintenance of Seepage Control System, Waterbury Dam
Term Contract
Results
$196,885 est. value
Waterbury, VT

Camp Wihakowi Dam Removal
Demolition
Construction
Northfield, VT

Stevens Branch Dam Removal Study and Design
New Construction, Term Contract
Bidding
Montpelier, VT 05602

Miles Pond Dam Improvements
Results
$120,000 est. value
Concord, VT 05824

Last Updated 08/19/2021 08:18 AM
Project Title

Laplatte River Lamprey Barrier Project

Physical Address View project details and contacts
City, State (County) Shelburne, VT 05482   (Chittenden County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A 2 to 3-foot tall concrete Lamprey Barrier will be installed in the LaPlatte River in Shelburne, Vermont to prevent upstream migration of invasive and predatory sea lamprey. The project is located just downstream of Falls Road Bridge.US Fish and Wildlife Service (FWS) is currently seeking competitive bids to build the concrete barrier and complete associated site work. Project construction is anticipated in late Summer and Fall of 2021. Site recovery work may extend into Spring 2022. Work tasks will generally involve installation and maintenance of erosion and sediment controls; water control to divert water around the construction area; installation of cast-in-place concrete barrier on bedrock; site access; and site restoration.

Details

Dam/Tunnel, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.