Similar Projects
F--Glade Well Pluggings
Term Contract
Design
Lakewood, CO

Pump and Motor Installation for Wells LDA-8, LDA-14, and DE-14
Infrastructure
Bidding
Castle Pines, CO

Evie Dennis Heat Pump Replacement
Infrastructure
Bidding
Denver, CO 80249

2021 Planned Well Rehabilitation and Well Abandonment / Denver Basin Aquifer Wells
Post-Bid
Castle Rock, CO

Avon Drinking Water Facility Chemical Feed Upgrades
Post-Bid
Vail, CO

BLM-CO-NWD - CRV FO - Greenhorn Water Well
Results
Gypsum, CO

Well 7 WTP Modifications
Results
Monument, CO

Non-Potable Pond Pump Station
Construction
Brighton, CO 80601

Ritoro Operations Building and Wells A-2 and D-2 Project
New Construction, Infrastructure
Construction
$2,100,000 est. value
Elizabeth, CO 80107

Raw Water Supply Pumps Project
Infrastructure
Bidding
Evergreen, CO 80439

Rueter-Hess Well House Modifications Progressive
Post-Bid
Parker, CO 80134

North Campus Well Field Expansion, Former Thornton Property - Groundwater Production Well Drilling Project
Results
$584,000 to $700,000 est. value
Aurora, CO 80012

2022 Replacement Well A-1R project
Infrastructure
Bidding
$550,000 est. value
Highlands Ranch, CO

Co-Monte Vista NWR-Monte Vista Wells
Post-Bid
Monte Vista, CO

NTP Vertical Turbine Pump Rebuild
Results
Brighton, CO 80603

Last Updated 04/08/2022 03:42 PM
Project Title

CMGC Services for Construction of a New Pump Facility

Physical Address View project details and contacts
City, State (County) Dillon, CO   (Summit County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Providing CMGC services for construction of a new Pump Facility, to include: Pre-Construction services for budgeting, scheduling and identification of long lead time materials, along with Construction Management services to complete the construction of the project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents