Similar Projects
Last Updated | 10/05/2022 05:05 PM |
Project Title | Kent State University Airport Runway Design Study |
Physical Address | View project details and contacts |
City, State (County) | Stow, OH 44224 (Summit County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Runways/Taxiways, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Request for Qualifications, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $160,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Airfield Pavement Design 2. FAA Regulations and Requirements 3. Airfield Operations and Safety Phasing 4. FAA Required Submissions & Approvals for construction on Airports 5. ODOT Grant Compliance 6. Survey - Layout and design SERVICES REQUIRED: Architecture or Engineering This design study is being primarily funded thru an FAA AIP Grant and shall conform to all applicable FAA requirements and codes The FAA grant will pay for 90% of all eligible fees with ODOT Aviation paying for 5% and the rest through local funding. All investigative work must be scheduled with the owner and coordinated with airport operations. Any disruption of airport operations or services must be scheduled with the airport in advance to allow permit proper notifications to be issued. ANTICIPATED SCHEDULE: A/E SERVICES START: April 2022 A/E SERVICES COMPLETED: September 2022 EDGE PARTICIPATION GOAL: Percent of initial TOTAL A/E Fee : 9% Submit all questions regarding this RFQ in writing to Michael Wasowski at mwasowsk@kent.edu with the project number included in the subject line (no phone calls please). As of July 7, 2022, the design firm has been selected. The construction documents completion timeline has not been released. A tentative bid schedule for contractors has not been disclosed. The construction timeline has not been determined. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |