Similar Projects
Historic Building Rehabilitation and Preservation - Callaway Plantation
Post-Bid
Washington, GA 30673

Spencefield Drainage Box Improvements II
Post-Bid
Less than $75,000 est. value
Moultrie, GA 31788

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

Cherry-Church-Blanchard-King Avenues Drainage Improvements
Results
Pine Mountain, GA

Proposed Drainage Improvements to Serve The Lake Blackshear Regional Library
Post-Bid
Less than $50,000 est. value
Americus, GA 31709

Sanitary Sewer, Street and Drainage Improvements
Results
Less than $400,000 est. value
Blakely, GA 31723

Storm Drainage and Paving Improvements to Serve Peachtree Street
Post-Bid
Doerun, GA 31744

Flint River Outfall Replacement - Phase 3
Results
Less than $9,399,555 est. value
Morrow, GA 30260

Church Street Trench Backfill and Resurfacing Improvements
Post-Bid
Palmetto, GA 30268

Wahoo Creek-Little River Watershed Management Plan
Results
Atlanta, GA 30334

Midtown Greenway Extension - Stream Restoration Project
Post-Bid
Gainesville, GA 30501

Millen 2018 CDBG
Results
Millen, GA

Detention Pond Improvements Peachtree Road Highrise
Post-Bid
Atlanta, GA 30309

Recreation Department Improvements
Results
Millen, GA

Hanarry Point Drainage Improvement Project
Post-Bid
Lawrenceville, GA 30045

Reported 05/18/2021 12:00 AM
Project Title

Terminal Area Expansion Grading and Drainage Phase 1A

Physical Address View project details and contacts
City, State (County) Dallas, GA 30157   (Paulding County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project is the first phase of construction in support of the new Chattahoochee Tech Aviation Academy and approximately 1 mile of public roadways and 1 mile of public airport taxiways to provide for public access of over 20 acres of new airport General Aviation development. Project Phase 1A is to install 2150 Linear Feet of Roadway Drainage Structure covered to a minimum depth of 10 feet with approximately 60,000 cubic yards of unclassified fill. The site is previously cleared of trees larger than 5 inches and the project will involve clearing of small trees and grubbing. Fill dirt for cover may be taken from any location in the borrow pit with all resulting slopes cut to 3:1 or greater. A detention pond is to be constructed per erosion control drawings at the eastern limit of construction and left in place at the conclusion of the project. Existing tree stumps may be cut off within 6 inches of the top of ground and the roots buried in place with minimal ground disturbance. The project will also include grassing and erosion control.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents