Similar Projects
LED Traffic Signals
Bidding

Misc. Traffic Control Devices
Term Contract
Post-Bid

Traffic Signal Hardware
Term Contract
Post-Bid
Philadelphia, PA 19102

Water Backflow Preventers and Shut-Off Valves Replacement
Results
Philadelphia, PA 19145

Advanced Traffic Management System
Term Contract
Results
$4,872,319 est. value

Bartram's Mile Maintenance Building and Water Service Extension
Renovation
Construction
$43,000,000 est. value
Philadelphia, PA 19143

Blanket NF 6397748 Flex Pipe to Turbo
Post-Bid
Philadelphia, PA

Rising Sun and Castor Avenue Traffic Signal Improvements: Design-Build Activities Limited to ADA Ramps
Results
$2,500,000 to $4,999,999 est. value
Philadelphia, PA 19019

Pipe 3/4" Conduit Rigid Hard Galvanized
Post-Bid
Philadelphia, PA

Relay of Water Mains in State Road fom Cottman Avenue to Shelmire Avenue
Results
$300,000 to $500,000 est. value
Philadelphia, PA 19136

Valve .5" Sweat-End Ball,(Nibco SPF-600A
Post-Bid
Less than $25,000 est. value
Philadelphia, PA

Sewer Reconstruction & Relay of Water Mains
Results
$2,000,000 to $3,000,000 est. value
Philadelphia, PA 19102

Subsurface Utility Locating and Marking Services
Post-Bid
Philadelphia, PA

Sewer Reconstruction & Relay of Water Mains
Results
$4,000,000 to $5,000,000 est. value
Philadelphia, PA 19102

Relay of Water Mains
Results
$2,000,000 to $3,000,000 est. value
Philadelphia, PA 19102

Last Updated 06/12/2020 02:56 PM
Project Title

Modern Roundabout - Frankford, Trenton, York

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Traffic Signalization, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes but is not limited to traffic signing and pavement marking, construction of ADA ramps and curb bumpouts, revising drainage inlet location, adding concrete splitter islands, installing traffic signal controllers, conduit, junction boxes, interconnect wiring, mast arms, CCTV cameras, Bluetooth readers, transit signal priority equipment and all necessary hardware. Goal: MBE 15%-17% WBE 10%-12%

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents