Last Updated | 05/03/2023 02:03 PM |
Project Title | Nemah Hatchery Venturi Drain Line Repair |
Physical Address | View project details and contacts |
City, State (County) | South Bend, WA 98586 (Pacific County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $30,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide all labor, materials, equipment, and permits to repair the venturi drain line at the Department's Nemah Hatchery, located at 415 Northeast Nemah Road, South Bend, Washington 98586, in Pacific County The goal of this project is to repair the venturi drain line at the Nemah Hatchery located near South Bend, Washington. The scope of work includes all work as shown and described in the Drawings and Specifications. This project is organized into two parts: Bid Item 1: Repair 6-inch steel pipe: Field verify pipe, fittings, and associated components, include all costs and permits required to sawcut existing asphalt, excavate and replace in kind the damaged pipe, fittings, associated components, and pipe trench backfill. Bid Item 2: Asphalt repair: Repair the compacted top course and asphalt removed during the excavation of the venturi drain line. For information or technical questions regarding this project email CAMP.Bids@dfw.wa.gov with the project title and project number in subject line and address questions to the Project Manager. Questions resulting in changes to the scope or nature of the drawings, specifications, or bid documents will be answered by addendum/addenda reflective of the Owner's process. The Owner will NOT answer questions received after 2:00 p.m. on April 13, 2023. All addenda issued are part of the bid documents. The Owner will not be responsible for any oral interpretations. Engineer's Estimate: $25,000 Substantial Completion shall be achieved by June 23, 2023. Final Completion shall be achieved by June 30, 2023. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |