Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

South Heights Flood Improvements II
Infrastructure
Bidding
$39,000 CJ est. value
Beaver, PA 15009

Borough of Monaca - New Civic Center
New Construction, Infrastructure - 27,650 SF
Bidding
$6,000,000 CJ est. value
Monaca, PA 15061

2022 Gravel Road Program
Infrastructure
Post-Bid
$110,000 CJ est. value
Glasgow, PA 15059

Center Grange Primary School Additions and Renovations - Plumbing Construction
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Aliquippa, PA 15001

Concrete Batch Plant Site Development Montgomery Locks & Dam
Infrastructure
Results
$11,902,980 CJ est. value
Monaca, PA 15061

Old Steffin Hill Sanitary Sewer Repairs
Infrastructure
Results
$128,605 CJ est. value
Chippewa Township, PA 15010

ExxonMobil Petrochemical Plant
New Construction, Infrastructure
Pending Verification
$10,000,000,000 CJ est. value
Beaver, PA 15009

St. Cecilia Regency Apartments
New Construction, Infrastructure
Pending Verification
$12,100,000 CJ est. value
Rochester, PA 15074

Mercer Road Bridge
Demolition, New Construction, Infrastructure
Conception
$3,220,800 CJ est. value
Beaver Falls, PA 15010

Alleghenyville Road (SR 3024) over I-176
Infrastructure
Design
$4,171,810 CJ est. value
Brecknock Township, PA 19540

Rail Road Storm Sewer Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Midland, PA 15059

Last Updated 10/12/2023 02:34 AM
Project Title

Laird Drive Culvert Replacement

Physical Address View project details and contacts
City, State (County) Aliquippa, PA 15001   (Beaver County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $266,424 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

CLARIFICATION DEADLINE 11/2/2023 4:00 PM The Project includes the following Work: The Project consists of the full removal of two existing concrete pipes that carry Trampmill Run underneath Laird Drive near Hopewell Community Park. This includes, but is not limited to, all traffic maintenance and protection, erosion and sedimentation controls, and all excavation, support of excavation, and removal and disposal of the existing pipes. Work will also include the complete installation of a new aluminum arch culvert. Work includes restoration of the Trampmill Run embankment through installation of stone cross vanes and riparian buffer zones. Hopewell Township reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of Hopewell Township, and to reject any or all proposals.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents