Similar Projects
Breed - Townsend, Parkway Drive - CTH W
Infrastructure
Bidding
Breed, Townsend, WI

Twin Valley Road Improvements
Infrastructure
Bidding

Park Avenue Reconstruction
Infrastructure
Post-Bid
$750,000 est. value
Oconto Falls, WI 54154

West Maple Street Improvements
Infrastructure
Post-Bid
Lena, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Jones Avenue Urban Design
Infrastructure
Bidding
Oconto, WI 54153

2021 Flatley Avenue Reconstruction
Results
$605,000 est. value
Oconto Falls, WI

2021 Harbor Road and Splinter Causeway Reconstruction
Results
$2,250,000 est. value
Oconto, WI 54153

T. Underhill, CTH R, Shawano County Line - CTH VV
Results
WI

2021 Splinter Causeway Reconstruction
Results
$1 to $300,000 est. value
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Pulaski - STH 22, Pulaski NVL - CTH E; Pulaski - STH 22, CTH E - STH 22
Results
Pulaski, WI

2021 Cross Road Improvements
Infrastructure
Results
Sobieski, WI

Epoxy Pavement Markings - STH/USH, Locations on STN Per Annual Plan
Infrastructure
Results

Last Updated 03/14/2022 01:02 AM
Project Title

Shawano - Gillett, South County Line - Finnegan Lake Road

Physical Address View project details and contacts
City, State (County) WI   (Oconto County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Oconto County; 9180-25-71, WISC 2022 252; STH 22; 3.498 Miles; Grading, Base, Milling, Asphalt Pavement, Culvert Pipe, and Pavement Markings Excavation Common, 290 CY; Base Aggregate Dense, 145 Ton; Marking Epoxy, 57,147 LF; Construction Staking, 18,469 LF; Construction Staking, 4 Each; Culvert Pipe, 80 LF 24”, 82 LF 18”; Asphaltic Surface, 480 Ton; HMA Pavement, 15,041 Ton; Removing Asphaltic Surface Milling, 64,804 SY; Tack Coat, 8,762 Gals; Foundation Backfill, 210 CY.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents