Similar Projects
Last Updated | 04/03/2021 03:04 AM |
Project Title | Asphaltic Concrete Paving |
Physical Address | View project details and contacts |
City, State (County) | Manitowoc, WI 54220 (Manitowoc County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Asphalt resurfacing on Washington Street from S. 15th Street to S. 18th Street: Work includes existing asphalt milling and removal, unclassified excavation, 8” H.E.S. concrete, 6” C.A.B.C. with 2” HMA patches, New 3” HMA, some inlet replacement, storm sewer spot repair, manhole casting replacement and Epoxy Paint pavement markings. 2. Reconstruction of the Alley Bounded by N. 5th St., N. 6th St., New York Ave. and Pine St.: Work includes unclassified excavation, new 12” of C.A.B.C., geotextile fabric, 3” HMA pavement, New storm manhole, storm inlet and 12” PVC pipe. 3. Reconstruction & Widening of Mariners Trail from the Manitowoc Marina to the Little Manitowoc River Bridge: Work includes unclassified excavation, Geotextile Fabric, 8” C.A.B.C., Geotextile Fabric, 2.5” HMA Pavement, Topsoil, Seed and Erosion Mat. The Contractor shall note that the work on Washington Street shall not be allowed to start prior to July 6th Location / Site Directions: Washington St - S 15th to S 18th St Alley bounded by N 5th, N 6th, New York & Pine St Mariner's Trail |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |