Similar Projects
Chilton - Valders, STH 67 - Roosevelt Street
Results
Chilton, Valders, WI 53014

Manitowoc - Green Bay, SCl - NCl
Results
Green Bay, Manitowoc, WI 54220

Elkhart Lake - Kiel, South County Line - STH 32/57; Plymouth - Kiel, Suhrke Road - North County Line
Results
Elkhart Lake, Kiel, WI 53042

2021 Cold-In-Place Asphalt Recycling
Post-Bid
Manitowoc, WI

2021 Street, Parking and Trail Improvements
Results
$115,000 est. value
Kiel, WI 53042

2021 Road Improvements (TRID)
Results
Less than $480,000 est. value
Two Creeks, WI

North 8th Street and Maritime Drive Intersection Improvements
Bidding
Manitowoc, WI 54220

Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

Concrete Paving (Broadway) and Slab Replacements
Bidding
Manitowoc, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Portland Cement Concrete Road Reconstruction
Post-Bid
Two Rivers, WI 54241

2021 Concrete Paving I and Concrete Slab Replacement
Results
Manitowoc, WI

Concrete Paving III (South 30th Street Reconstruction)
Bidding
Manitowoc, WI 54220

Hot Mix Paving
Bidding
Reedsville, WI 54230

Last Updated 04/03/2021 03:04 AM
Project Title

Asphaltic Concrete Paving

Physical Address View project details and contacts
City, State (County) Manitowoc, WI 54220   (Manitowoc County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Asphalt resurfacing on Washington Street from S. 15th Street to S. 18th Street: Work includes existing asphalt milling and removal, unclassified excavation, 8” H.E.S. concrete, 6” C.A.B.C. with 2” HMA patches, New 3” HMA, some inlet replacement, storm sewer spot repair, manhole casting replacement and Epoxy Paint pavement markings. 2. Reconstruction of the Alley Bounded by N. 5th St., N. 6th St., New York Ave. and Pine St.: Work includes unclassified excavation, new 12” of C.A.B.C., geotextile fabric, 3” HMA pavement, New storm manhole, storm inlet and 12” PVC pipe. 3. Reconstruction & Widening of Mariners Trail from the Manitowoc Marina to the Little Manitowoc River Bridge: Work includes unclassified excavation, Geotextile Fabric, 8” C.A.B.C., Geotextile Fabric, 2.5” HMA Pavement, Topsoil, Seed and Erosion Mat. The Contractor shall note that the work on Washington Street shall not be allowed to start prior to July 6th Location / Site Directions: Washington St - S 15th to S 18th St Alley bounded by N 5th, N 6th, New York & Pine St Mariner's Trail

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents