Similar Projects
Cicero North Syracuse High School HVAC Phase 1 - General Construction
Renovation
Sub-Bidding
$300,000 CJ est. value
Cicero, NY 13039

Cicero North Syracuse High School HVAC Phase 1 - HVAC
Renovation
Sub-Bidding
$700,000 CJ est. value
Cicero, NY 13039

J041--Cooling Tower Fill Service for Syracuse VA 528A7 VHA Directive 1193
Term Contract
Post-Bid
Syracuse, NY 13210

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

HVAC Inspection and Repair Services
Term Contract
Results
Syracuse, NY

Furnish HVAC Filters as Specified
Term Contract
Results
NY

Cooling and Heating Inspections for Four (4) Stultz Units Services
Term Contract
Sub-Bidding
Syracuse, NY 13210

HVAC Air Filters
Term Contract
Post-Bid
Syracuse, NY

Medical Library HVAC Modifications
Alteration
Results
Syracuse, NY 13210

Furnish Sheriff Department Boiler Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Syracuse, NY 13202

HVAC
Alteration
Post-Bid

University Hospital AIIR Adult ED Ventilation Upgrade
Alteration
Results
Syracuse, NY 13210

2021 Capital Improvement Project phase I - HVAC
Renovation
Sub-Bidding
$800,000 CJ est. value
Marcellus, NY 13108

Hvac Equipment Maintenance And Related Services
Term Contract
Post-Bid

Rehabilitate 4th Floor HVAC - Bray Hall at SUNY ESF
Alteration
Results
$2,500,000 to $5,000,000 est. value
Syracuse, NY 13210

Reported 08/09/2022 12:00 AM
Project Title

TU4 Accessible Building Entrance and HVAC Replacement

Physical Address View project details and contacts
City, State (County) Syracuse, NY 13210   (Onondaga County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project A: Removal of existing concrete walks, ramps, roof, entrance, and landscaping at the front entrance to building 4. The new work includes installing a new roof and canopy at the entrance as well as a new entrance door. Site work includes new accessible ramps and walks to the existing entrances to TU4, as well as new decorative landscaping around the new work. Existing benches at the site are being relocated for easier pedestrian use. Project B: Removal and replacement of existing cooling coil, refrigerant piping and Condensing unit serving AC-1 and AC-2.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents