Similar Projects
UST Removals
Term Contract
Bidding
Fort Worth, TX

Rebuild Chlorine Room at North Main Elevated Storage Tank
Renovation
Bidding
Duncanville, TX

Cove Elevated Storage Tank Rehabilitation CDBG
Post-Bid
$272,000 est. value
Orange, TX

CID 05 - 2020 Ground Storage Tanks - E
Post-Bid
$724,000 est. value
Elmendorf, TX 78112

Elevated Storage Tank No. 2 Rehabilitation
Results
Less than $1,000,000 est. value
The Woodlands, TX

Plugging & Abandonment of 4 Gas Wells, Cross Bar M
Results
Amarillo, TX

Coral Vines Elevated Storage Tank Coating Restoration and Rehabilitation
Alteration
Bidding
$715,671 est. value
Corpus Christi, TX

Rusk Street Elevated Storage Tank (EST) Minor Preventive Maintenance
Post-Bid
Kilgore, TX 75662

Water Storage Tank and Intake Inspection and Cleaning Services
Term Contract
Results
$12,330 est. value
Lewisville, TX 75067

North Water Plant Ground Storage Tank
Infrastructure
Bidding
$650,000 est. value
Richwood, TX

Peppermint Elevated Storage Tank Rehabilitation
Post-Bid
Less than $486,000 est. value
Kirby, TX 78219

Story Road Elevated Storage Tank Rehabilitation
Results
$2,971,180 est. value
Irving, TX 75060

Standpipe Rehabilitation
Infrastructure
Bidding
$315,000 to $332,500 est. value
Reno, TX

2020 Water Production Storage Tank Facilities Project
Post-Bid
San Antonio, TX 78212

Water Supply and Storage Facility No. 2
Results
Less than $2,390,000 est. value
TX

Last Updated 06/03/2021 09:32 AM
Project Title

Water System Improvements Program, Clayton Well Site GST Influent Piping Modifications Project

Physical Address View project details and contacts
City, State (County) Dayton, TX   (Liberty County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Generally described as the installation of influent header piping at the existing ground storage tank that will fill the ground storage tank from the distribution system during low usage periods at night. In addition, this contract shall provide for the installation of a solenoid control valve, flow meter, electrical, controls, and concrete foundation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents