Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Sanitary Sewer Pipeline Closed Circuit Television Inspection Area 3
Term Contract
Bidding
Palo Alto, CA

Sewer & AC Water Group 793
Term Contract
Bidding
$6,670,000 est. value
San Diego, CA

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Full Trash Capture Devices
Infrastructure
Bidding
San Rafael, CA

Operation and Maintenance Services of Sewer and Water Systems in County Service Area (Csa) R-1967-1 Castlewood
Alteration
Post-Bid
CA

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Lincoln Elementary School Play Yard
Renovation, Alteration
Bidding
Burlingame, CA

Harbor Bay Isle Lagoon Improvements Project
Infrastructure
Post-Bid
$250,000 est. value
Alameda, CA 94502

Gold Flat Campground Upgrades
Renovation
Results
$700,000 to $1,100,000 est. value
Oroville, CA 95966

Bean Creek Road PM 2.10 Storm Damage Repair Project
Infrastructure
Bidding
$402,667 est. value
CA

Reported 03/14/2022 12:05 PM
Project Title

Fort Baker Sewer and Manhole

Physical Address View project details and contacts
City, State (County) Mill Valley, CA 94941   (Marin County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to upsize the existing Fort Baker Sewer Line and Manhole. The manhole is not draining fast enough for the incoming flow to exit, and the temporary handicaps placed on the pumps is not a permanent solution. This section of the sewage collection system captures all flow from Rodeo Beach to Fort Baker approximately 20,000 gallons daily in a normal summer condition and winter flows can reach over 80,000 gallons daily. The project location is near public water ways and a spill would affect natural resources immediately. The specific work items include but is not limited to, upsizing of the sewer line and manhole, demolition of existing manhole bench and reshape, bypass pumping, trenching through asphalt, excavation and patching of asphalt and base, and shoring.

Details

Division 03 - Concrete, Precast Concrete.
Division 22 - Plumbing, Common Work Results for Plumbing, Facility Drainage Manholes.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents