Similar Projects
Cellular Domestic Water Meter Installation
Bidding
Colorado Springs, CO

Monument Raspberry Lane Street and Waterline Improvements
Bidding
Monument, CO 80132

Construction and Installation of a Meter Vault
Post-Bid
Monument, CO 80132

Repair Utilities - Falcon Stadium
Post-Bid
$1,000,000 to $5,000,000 est. value
CO

Well No. 21 Transmission Pipeline
Results
Monument, CO 80132

Butterfly, Gate, and Tapping Valves
Term Contract
Results
Colorado Springs, CO

New Fire Station Utility
Construction
Falcon, CO 80831

Woodmen Hills West Water Pipeline
Post-Bid
Peyton, CO 80831

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Monument Valley Park Water Utility Construction
Post-Bid
Colorado Springs, CO 80903

South Santa Fe Water Main Project
Results
Less than $500,000 est. value
Fountain, CO 80817

Water Utility Construction Services
Post-Bid
Colorado Springs, CO 80919

Fire Hydrants
Term Contract
Results
Colorado Springs, CO 80947

Rolling Hills Tank Inlet Pipeline
Post-Bid
Colorado Springs, CO

All Division Horizontal Directional Drilling Services
Results
Colorado Springs, CO 80947

Last Updated 03/25/2020 06:55 PM
Project Title

Scrub Oak Circle Waterline Replacement

Physical Address View project details and contacts
City, State (County) Monument, CO 80132   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include all necessary labor, supervision, equipment, tools, and materials for the replacement of the Scrub Oak Circle Waterline. Work includes, but is not limited to, demolition/ abandonment of the existing water distribution main; construction of a new water distribution main (using the open cut construction -OR- pipe bursting method); connections to existing water mains; reconnection of existing water service connections (including corporation stops); removal and replacement of fire hydrants; and installation of all valves, fittings, bends, tees, crosses, air/vacuum relief valves, and appurtenances required for a complete and functional water distribution system. Work includes all associated site work related to the project. Close coordination between onsite contractors is imperative. It shall be the sole responsibility of the Contractor to coordinate execution schedules, equipment, and working spaces to avoid any delays to the project. All project impacts and delays shall be the sole responsibility of the Contractor and shall under no circumstances incur additional costs to WWSD.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents