Similar Projects
Vine Street School - Heating System Project
Alteration
Post-Bid
Bangor, ME 04401

Holbrook Middle School Indoor Air Quality Improvements
Alteration
Post-Bid
Holden, ME 04429

Holden Elementary School Indoor Air Quality Improvements Project
Alteration
Results
Holden, ME 04429

UM DP Corbett HVAC Renovation
Alteration
Results
Orono, ME

Abraham Lincoln School - Indoor Air Quality Improvements
Renovation - 36,000 SF
Post-Bid
$300,000 CJ est. value
Bangor, ME 04401

Eddington Elementary School Indoor Air Quality Improvements Project
Alteration
Results
Eddington, ME 04428

HVAC Maintenance Services at Seven (7) Locations
Alteration
Post-Bid
$96,814 est. value
Hampden, ME

Seawater Systems Water Chiller
Term Contract
Results
Orono, ME

Fruit Street School - Heating System Upgrade project
Alteration
Post-Bid
$70,000 est. value
Bangor, ME 04401

Hvac Preventative Maintenance and Repair Work in Region 5/Located in Various Locations in the Counties of Washington, Penobscot and Aroostook
Alteration
Results

Indoor Air Quality Improvements Fairmount School
Renovation
Post-Bid
$50,000 CJ est. value
Bangor, ME 04401

HVAC, Ductwork and Ventilation Cleaning Services, Region 4 Central Lab
Alteration
Results
Bangor, ME

Indoor Air Quality Improvements - Fourteenth Street School
Renovation
Post-Bid
$800,000 CJ est. value
Bangor, ME 04401

Indoor Air Quality Improvements - Mary Snow School
Renovation
Post-Bid
$800,000 CJ est. value
Bangor, ME 04401

HVAC Maintenance
Term Contract
Post-Bid
Bangor, ME 04401

Last Updated 03/01/2023 11:22 AM
Project Title

Science Wing Hvac Upgrades Bangor High School

Physical Address View project details and contacts
City, State (County) Bangor, ME 04401   (Penobscot County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A bid security will be required consisting of a 5 percent (5%) Bid Bond or a Certified Check in lieu of the Bid Bond is required. Performance Bond and Payment Bond, each for 100% of the value of the work are required. The Davis-Bacon Act requirements apply to this project. Scope of Work Summary: Removal of existing Unit Ventilators, exhaust fans, control valves, and associated ductwork. Install new Dedicated Outdoor Air System (DOAS), Variable Refrigerant Flow (VRF) System, ductwork, and Cabinet Unit Heaters (CUH).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents