Similar Projects
Water, Sewer, Street and Storm Drainage Improvements
Infrastructure
Bidding
Colquitt, GA

F. Wayne Hill Water Resources Center Influent Screenings Improvements Project
Alteration
Bidding
Buford, GA 30519

Water System Improvements
Post-Bid
Less than $1,050,000 est. value
Pavo, GA 31778

Westside Business Park Infrastructure Expansion Phase 3
Post-Bid
Bemiss, GA 31602

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

Greenhouse Copper Pipe Replacement
Results
Byron, GA 31008

Water System Improvement
Infrastructure
Bidding
Ludowici, GA

Construction of the Uchee Creek Campground Northwest Loop Water Main
Post-Bid
Columbus, GA 31901

FY 2019 CDBG Phase III Water System Improvements
Results
Less than $700,000 est. value
Edison, GA 39846

Purchase of Water Meters on an Annual Contract
Post-Bid
Lawrenceville, GA

Agriculture Meter Installation Project
Results
Less than $285,785 est. value
Hapeville, GA 30354

Installation of Water and Wastewater Infrastructure
Term Contract
Post-Bid
GA 31543

Steel Pipe Replacement Project
Results
Less than $613,069 est. value
Lawrenceville, GA

Water Meter Testing Services
Term Contract
Post-Bid
Gainesville, GA

Force Main Replacement Phase 1
Results
Buford, GA 30518

Last Updated 03/23/2022 11:57 PM
Project Title

Taylors Creek Extension

Physical Address View project details and contacts
City, State (County) Hinesville, GA   (Liberty County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of furnishing all labor and materials to complete the Non- Potable Reuse Line Extension to Taylors Creek. More specifically, the project will consist of connecting to an existing 12” non-potable reuse line (NPRL) and constructing 5775 LF of NPRL (3580 LF of trenched 16” PVC NPRL, 450 LF of 16” PVC directional bore, 1225 LF of 24” PVC directional bore, and 165 LF of 20” PVC directional bore with 16” fusible PVC carrier pipe) ending at Taylors Creek, installation of all necessary valves, fittings and meters, two concrete valve vaults, repurposing an existing SCADA panel for use along the NPRL extension, one Low Profile Cascade Aerator with concrete structure, and a concrete end treatment for the 24” discharge into Taylors Creek

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents