Similar Projects
Water Service Replacement Glen Burnie/Pasadena
Infrastructure
Bidding
$1,000,000 to $3,000,000 est. value
MD

Broadneck Sewer Service Areas ARV Replacement
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Annapolis, MD

Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

Valve and Fire Hydrant Assessment Operation and Maintenance
Term Contract
Post-Bid
$8,000,000 est. value
Baltimore, MD 21270

Gatwick Road Watermain Rehabilitation
Results
$250,000 to $500,000 est. value
Annapolis, MD 21401

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

Water Main Repair- Replace Valve Bonnet Bolts Phase 4
Results
$1,000,000 to $3,000,000 est. value
Annapolis, MD 21401

Area Water And Sewer House Connection Construction
Term Contract
Results
Laurel, MD 20707

Water Meter Test Bench System
Results
$235,000 est. value
Annapolis, MD 21401

Fort Smallwood/Nursery Road Valve Replacement
- 5,534 SF
Results
$2,000,000 to $3,000,000 est. value
Annapolis, MD 21401

San Juan Drive Water Main Replacement
Results
Laurel, MD

RT3 Water Main Crossing
Results
$100,000 to $500,000 est. value
MD

Tanyard Springs Road Widening and Water Main
Results
$1,000,000 to $1,500,000 est. value
Annapolis, MD 21401

Full Delivery of Turnkey Water Quality Improvements FY21
Results
MD

Last Updated 06/04/2021 09:41 AM
Project Title

Water Main Repair-Replace Valve Bonnet Bolts Phase 5

Physical Address View project details and contacts
City, State (County) Annapolis, MD   (Anne Arundel County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the following major items: Rehabilitation of 500 water main line valves in the Odenton and Crofton areas.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents