Similar Projects
Horizon Facilities Building
New Construction - 4,850 SF
Conception
$875,000 est. value
Spokane Valley, WA 99216

Summit Centre Office Warehouse
New Construction - 79,576 SF
Design
Puyallup, WA 98373

Public Storage
New Construction - 224,000 SF
Design
$15,000,000 est. value
Bellevue, WA 98005

Public Works Facility Construction
New Construction - 8,789 SF
Bidding
$4,529,000 to $4,717,700 est. value
East Wenatchee, WA 98802

Evergreen Pump Station Upgrades
New Construction, Renovation - 1,280 SF
Bidding
$4,100,000 est. value
Everett, WA 98203

Public Storage
New Construction - 81,041 SF
Post-Bid
Kent, WA 98032

Port of Port Angeles Marine Trades Center Building Design
New Construction, Alteration - 30,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Port Angeles, WA 98363

Storage Building and Training Tower
New Construction, Alteration - 3,700 SF
Results
Less than $5,000,000 est. value
Granite Falls, WA 98252

State Fair Park Barns And Ag Building Structural Upgrade
Renovation
Results
Yakima, WA

West Coast Self Storage
New Construction - 57,221 SF
Construction
$4,249,348 est. value
Lacey, WA 98503

2400 Office/Warehouse Renovations
Renovation
Construction
$1,800,000 est. value
Vancouver, WA 98661

Latona Station Apartments
New Construction - 194,500 SF
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98105

Brothers Flooring Warehouse
New Construction - 3,000 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Spokane, WA 99205

Redmond Flex Warehouse
New Construction - 140,000 SF
Design
$10,000,000 CJ est. value
Redmond, WA 98053

Fruit Valley Modernization
New Construction, Alteration
Bidding
$3,000,000 est. value
Vancouver, WA 98687

Last Updated 02/08/2022 09:53 AM
Project Title

Construction of the Wastewater Treatment Plant Storage Shelter

Physical Address View project details and contacts
City, State (County) Wenatchee, WA   (Chelan County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $625,522
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed includes: construction of a storage shelter, replacing a manual swing gate with an automated cantilevered gate and, site work including regrading, storm drain improvements, and paving throughout the site as well as other minor improvements.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents