Last Updated 08/09/2021 04:22 PM
Project Title

Lakeside WTP Chemical Tank Replacement Project

Physical Address View project details and contacts
City, State (County) Flowery Branch, GA 30542   (Hall County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will consist of replacing an existing 6,100 gallon chemical tank with a new 6,023 gallon chemical tank. The work also includes: removing and disposing of the existing tank, tank fittings, heat tracing, tank manway and ladder, tank restraint system and related appurtenances. The new tank and tank accessories to be provided by the City.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents