Similar Projects
Woodville Road Widening Phase 1 - Old Hearne to Texas Avenue - ST_ 15_ 001 - City of Bryan
Infrastructure
Conception
$5,440,000 CJ est. value
Bryan, TX 77803

Old Hearne Reconstruction (Wilkes to Woodville) Phase 3 and 5 - ST_ 11_ 002/ST_ 11_ 003 - City of Bryan
Infrastructure
Conception
$4,400,000 CJ est. value
Bryan, TX 77803

Jersey Mikes Subs / Bryan
Renovation - 1,440 SF
Design
$65,000 est. value
Bryan, TX 77802

B200 Buffer Annex - Fujifilm Diosynth Biotechnologies Texas
Addition, Demolition, Infrastructure - 25,860 SF
Design
$8,000,000 CJ est. value
College Station, TX 77845

Steeplechase and Central Park Improvements (Rebid)
Infrastructure
Bidding
$767,000 CJ est. value
College Station, TX 77840

SH0006 - Bridge Scour Repair
Infrastructure
Bidding
$182,714 CJ est. value
Bryan, TX 77802

Lake Walk Retail Building B5
New Construction - 10,450 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Bryan, TX 77807

Insomnia Cookies
Renovation - 1,809 SF
Post-Bid
$250,000 est. value
College Station, TX 77840

Bryan Midtown Park Phase 2 - Bigshots Access Drive
Results
$1,012,000 est. value
Bryan, TX 77803

Land Clearing
Infrastructure
Results
Bryan, TX

Hudson Offices / 3953 Cross Park
New Construction, Infrastructure - 4,811 SF
Pending Verification
$300,000 CJ est. value
Bryan, TX 77802

Crossway Auto Center
New Construction, Infrastructure - 2,903 SF
Pending Verification
$246,755 CJ est. value
Bryan, TX 77808

1050 North Harvey Mitchell Development
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Bryan, TX 77803

Pepperoni's Pizza / Campus Crossing
Renovation, Build-Out - 1,343 SF
Design
$150,000 est. value
College Station, TX 77840

City Course Bridge Replacement at Hole 9
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Bryan, TX 77802

Last Updated 08/23/2022 02:04 PM
Project Title

Dutch Bros Coffee - University Drive (TX0305) / College Station

Physical Address View project details and contacts
City, State (County) College Station, TX 77840   (Brazos County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New freestanding facility of approximately 930 square feet for quick serve coffee / beverage with drive-thru and walk up transaction areas. On site improvements are included in the Scope of Work. As of August 2022, construction is underway.

Details

930 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents