Similar Projects
Murphy USA #7171/7856 / Russellville
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Russellville, AL 35653

The Gables On Lawrence
New Construction, Infrastructure
Conception
Fairhope, AL 36532

Bluff Park Elementary School Addition
Addition, Demolition
Design
$2,000,000 est. value
Hoover, AL 35226

Residence Inn By Marriott / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

Material Exploitation Center (MEC) at Redstone Arsenal
Addition, Demolition, Infrastructure - 9,890 SF
Bidding
$250,000,000 CJ est. value
Redstone Arsenal, AL 35808

JCDH Public Health Pavilion
Addition, New Construction, Infrastructure, Renovation
Bidding
$438,000 CJ est. value
Birmingham, AL 35233

Renovation of Breakthrough Charter School
Renovation
Post-Bid
Marion, AL 36756

Portable Classrooms at Legacy Prep School
New Construction
Post-Bid
Birmingham, AL

Mountain Brook Elementary Schools 2021 Renovations
Renovation
Results
Mountain Brook, AL 35223

Welcome Center Replacement (Site Construction/Grading, Drainage, Pavement, Lighting, and Structures) on I-65
Infrastructure
Results
$6,612,039 CJ est. value
Athens, AL 35613

New Elementary School, Stonebridge Elementary
New Construction - 132,000 SF
Construction
$21,379,000 est. value
Loxley, Spanish Fort, AL

Farmville Road Elementary School
New Construction - 73,000 SF
Construction
$17,729,000 est. value
Auburn, AL

Chapel Heights
New Construction, Infrastructure
Pending Verification
Auburn, AL

The Taylor
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Opelika, AL 36801

Fire Station #10 Construction - City of Dothan
New Construction, Infrastructure
Design
$5,500,000 CJ est. value
Dothan, AL 36301

Last Updated 09/13/2022 12:04 AM
Project Title

RFQ Contractor - New Elkmont Elementary School

Physical Address View project details and contacts
City, State (County) Elkmont, AL 35620   (Limestone County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $29,377,818 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**Project was awarded to Bailey Harris Construction Company for Construction of the New Elkmont Elementary School - Price to include base bid at $28,248,648.00, Alternate #1 at $1,073,234.00, and Alternate #2 at $55,936.00 for a total cost of $29,377,818.00. The contractor or sub-contractor submitting for pre-qualification should only submit for their primary trade of work. Masonry Subcontractor, Roofing Subcontractor, Security Subcontractor, Mechanical Subcontractor, Plumbing Subcontractor, Electrical Subcontractor, and Fire Suppression Subcontractor. Only subcontractors for these disciplines, who have been approved to bid pursuant to pre-qualification procedures and criteria established by the Owner, will be eligible to bid the Project. If a company is submitting for multiple services (ex. Mechanical and Plumbing), the company must submit prequalification forms for each discipline. A cashiers check or bid bond payable to Limestone County Board of Education in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. A list of qualified contractors and subcontractors will be available on May 20, 2022. Completion Time: The project shall be substantially complete by May 1, 2024. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owners judgment, the best interests of the Owner will thereby be promoted. Nonresident bidders must accompany any written bid documents with a written opinion of an attorney at law licensed to practice law in such nonresident bidders state of domicile, as to the preferences, if any or none, granted by the law of that state to its own business entities whose principal places of business are in that state in the letting of any or all public contracts.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents