Similar Projects
Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

Tower Grove Park - City of St. Louis
Infrastructure
Conception
$2,886,599 CJ est. value
Saint Louis, MO 63110

Olive West Residential
New Construction, Renovation, Infrastructure
Design
$25,000,000 CJ est. value
Saint Louis, MO 63108

Preservation Square Phase 4
Demolition, New Construction, Infrastructure, Renovation
Design
$10,000,000 CJ est. value
Saint Louis, MO 63106

St. Louis, Missouri Combined Sewer Overflow Rehabilitation Project
Infrastructure
Bidding
$15,000,000 CJ est. value
Saint Louis, MO 63103

AC Hotel by Marriott / Jefferson Arms Mixed-Use Renovations
Build-out, Renovation - 500,000 SF
Sub-Bidding
$103,700,000 CJ est. value
Saint Louis, MO 63103

Phase I - Center Redevelopment Welcome and Wellness Center
Demolition, New Construction, Infrastructure - 24,100 SF
Post-Bid
$10,000,000 CJ est. value
Saint Louis, MO 63120

Vande East Apartments - Exterior Pavers
Infrastructure
Post-Bid
$400,000 CJ est. value
Saint Louis, MO 63110

Police Precinct 1 - St. Louis County - Rebid
New Construction, Infrastructure - 17,224 SF
Results
$9,526,000 CJ est. value
Saint Louis, MO 63103

Construction of the Access Control Points in support of the National Geospatial-Intelligence Agency
New Construction, Infrastructure
Results
$711,651,970 CJ est. value
Saint Louis, MO 63107

Cervantes Convention Center Expansion and Modernization Project 1
Addition, Demolition, Renovation, Infrastructure
Construction
$123,867,709 CJ est. value
Saint Louis, MO 63101

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

The Flats at Forest Park
Demolition, New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saint Louis, MO 63108

Ponce Health Sciences University Medical School
New Construction, Infrastructure - 150,000 SF
Pending Verification
$80,000,000 CJ est. value
Saint Louis, MO 63101

O'Fallon Park - City of St. Louis
Infrastructure
Conception
$1,019,234 CJ est. value
Saint Louis, MO 63147

Last Updated 08/14/2023 10:29 AM
Project Title

Moxy Hotel by Marriott / Saint Louis

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63101   (Saint Louis City County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $16,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of work for the construction of a national brand hotel. As of August 14, 2023, design is complete, no building permits have been filed with the city. Information regarding the architect and general contractor is not known. A timeline for construction has not yet been obtained.

Details

13 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents