Similar Projects
Stone Point Park Drainage Improvements
Post-Bid
Old Tappan, NJ 07675

Teaneck Creek Restoration at Overpeck County Park
Post-Bid
Teaneck, NJ 07666

Hardenburgh Avenue Drainage Improvements
Results
Haworth, NJ 07641

Rehabilitation of Lake Road Culvert Over the West Branch
Results
Upper Saddle River, NJ 07458

Brandywine/Valley Forge Drainage Improvement - Phase 3
Post-Bid
Ho Ho Kus, NJ 07423

Emergency Drainage Repair
Results
Bogota, NJ

Tenafly Culvert Repairs Project
Post-Bid
Tenafly, NJ

Maintenance Timber/Underwater/Drainage Structural Repair Contract, North - 2020
Results
$5,000,001 to $10,000,000 est. value

Restoration of Sprout Brook
Post-Bid
Hackensack, NJ

Dewolf Road and Howard Drive Drainage Improvements
Results
Old Tappan, NJ 07675

Crescent Park Drainage Improvements
Post-Bid
Wallington, NJ 07057

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

NS95L Non-Vegetative Areas Milepost 120.6 to 121.3
Results
$490,659 est. value
Englewood, Fort Lee, Leonia, NJ

Parking Lot Resurfacing and Drainage Improvements at Woodside ES
Results
River Vale, NJ 07675

Paramus East Brook School Front Parking Lot Drainage and Repave
Results
Paramus, NJ 07652

Last Updated 03/25/2021 04:37 PM
Project Title

Restoration of Huff Pond

Physical Address View project details and contacts
City, State (County) Montvale, NJ 07645   (Bergen County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed under this contract includes the restoration of an existing pond and replacement of existing inlet and outlet pipes at the Memorial Drive Municipal Complex in the Borough of Montvale, NJ. Principal items of work in the project include: · Dredging of 2,850 tons of sediment · Removal of 42 L.F. of existing stormwater pipe · Installation of 82 L.F. of 24" HDPE pipe with inline check valve · Installation of 54 L.F. of 12" RCP · Installation of 15 L.F. of 12" PVC pipe · Installation of low flow valve and dissimilar coupler · Installation of 2 concrete headwalls · Installation of 54 L.F. of 12" RCP · 10 S.Y. riprap apron · Grading of grass swale · Plantings · Vegetative Maintenance

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents