Similar Projects
S Roadway Improvements
Bidding

Various Right Turn Lanes In Region One Other-Roadway Project
Bidding
$500,000 to $1,500,000 est. value

2020 Asphalt Seal Coat Projects
Post-Bid
Brigham City, UT 84302

Road Construction and Utility Improvements
Post-Bid
Brigham City, Corinne, UT 84307

SR-42; Idaho Line to SR-30 Junction Preservation Low Volume
Results
$1,500,000 to $3,000,000 est. value
UT

2020 Street Maintenance Project
Results
Less than $132,000 est. value
Perry, UT 84302

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

SR-30; SR-42 Junction to I-84 Preservation Low Volume
Results
$1,500,000 to $3,000,000 est. value
UT

Willard Elementary - Add Asphalt Play Area
Post-Bid
Willard, UT 84340

I-84; Howell to SR-102 Preservation High Volume
Results
$6,000,000 to $10,000,000 est. value
UT

Asphalt Projects
Post-Bid
Tremonton, UT 84337

I-84; Idaho to East Snowville Rehabilitation High Volume
Results
$6,000,000 to $10,000,000 est. value
Snowville, UT 84336

Zone 1E - Irrigation Pond
Post-Bid
Bluffdale, UT

NOAA WFO Radar Tower Road, Promotory Mt, UT
Results
$500,000 to $1,000,000 est. value
Promontory Point, UT 84307

I-15; SR-126 to US-91 Slab Replacements Rehabilitation High Volume
Post-Bid
$500,000 to $1,500,000 est. value
UT

Last Updated 04/22/2021 04:14 PM
Project Title

300 East Street Improvement Project

Physical Address View project details and contacts
City, State (County) Willard, UT   (Box Elder County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $99,210
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing damaged asphalt along portions of 300 East, placing new road base material, installing new curb and gutter on the west side of the roadway along with 6" thick drive approaches, fine grade road base for new asphalt pavement, and restoring manhole and valve collars.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents