Similar Projects
Crossroads Substation Screen Wall Construction
Bidding
Loveland, CO 80538

Historic Courthouse Stone Masonry
Post-Bid
Walsenburg, CO

Re-Plaster and Re-Tile The Bob Burger Recreation Center Lap Pool
Post-Bid
Lafayette, CO

Lone Tree Golf Clubhouse Exterior
Results
$150,000 to $200,000 est. value
Lone Tree, CO

Bear Park Phase III - Climate Battery and Dome Functionality
Results
Glenwood Springs, CO 81601

Exterior Restoration and Rehabilitation
Construction
Saguache, CO 81149

Julesburg Rest Area EIFS Repair and Window Replacement
Post-Bid
Less than $160,000 est. value
Julesburg, CO 80737

Remediate Campus Fall Hazards, Phase 1 and Phase 2
Results
$800,000 est. value
Golden, CO 80401

Rabbit Ears Pass Siding
Post-Bid
Less than $75,000 est. value
CO

Cu Den Bldg 1St Replace Main Doors
Results
Denver, CO

Buffalo Run Golf Course Club House Stair Railing Replacement
Post-Bid
Commerce City, CO

Exterior Stair Replacement - Timberline PK-8
Results
Longmont, CO 80504

Woodman Hall Exterior Egress Stair Replacement Project
Post-Bid
Fountain, CO 80817

Nottingham Park Pavilion Water Proofing Repair Project
Results
Avon, CO 81620

Paired Panel Operable Wall Partitions
Post-Bid
Glenwood Springs, CO 81601

Last Updated 04/14/2021 08:30 AM
Project Title

Outdoor Graduation Stage and Chair Rental

Physical Address View project details and contacts
City, State (County) CO   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The District desires equipment rental and supporting services to setup and transition between up to three (3) graduation ceremonies per day for participating schools. Service Providers must be able to setup provided equipment at specified locations inside each stadium prior to graduation events (stage, ramps, stairs, podium, etc.), setup student chairs on the field prior to each ceremony (accommodating number of graduates), reset student chairs on the field as needed between each event, remove student chairs from the field to allow for nightly watering and irrigation of the grass and tear down all equipment used for graduation ceremonies.

Details

Division 01 - General Requirements, Temporary Construction, Temporary Ramps.
Division 11 - Equipment.
Division 12 - Furnishings, Site Furnishings, Site Seating and Tables.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents