Similar Projects
Treatment Plant Operator
Term Contract
Post-Bid
Chicago, IL

Inspect and Maintain Tarp Electrical Control Chambers and Tide Gate Monitoring Systems
Alteration
Post-Bid
$500,000 est. value
Chicago, IL

Professional Plan Review, Inspection and Support Services on an as Needed Basis
Term Contract
Results
Orland Park, IL

IL Route 176 from Deerpass Road to Dean Street, Phase III
Infrastructure
Results
Marengo, IL 60152

HUD Nationwide Construction Inspection Services
Term Contract
Post-Bid
Less than $50,000,000 est. value

I-55 from South of I-80 to South of Weber Rd - North Bound and Southbound Designed Overlay Drainage, Phase III
Infrastructure
Results
Romeoville, IL 60441

I-55 from I-80 to US 52 (Jefferson St) - Interchange Reconstruction and US 52 at I-55 & at NE/SE Fr Rd
Infrastructure
Results
IL

East Ave: 55th Street to Joliet Road - Intersection Reconstruction, Phase III
Infrastructure
Results
Countryside, IL 60525

IL Route 132, West of Sheehan Dr. to Munn Rd. Dryland Bridge Replacement, Phase III
Infrastructure
Results
Lindenhurst, IL 60046

Various Phase III Pavement and Bridge Preservation Inspection Projects, Various Routes
Infrastructure
Results

IL Route 83: ILL 120 (Belvidere Rd) to ILL 137 and at Atkinson Rd, Phase III Project, Lake County
Infrastructure
Results
Waukegan, IL 60087

Various Phase III Projects, Various Routes, Various Counties
Infrastructure
Results

Various Phase III Projects, Various Routes, Various Counties
Infrastructure
Results

Various Phase II District One Sign and Tower Structure Inspection Projects
Infrastructure
Results
Less than $200,000 est. value

Various Phase II Statewide Sign Structure Inspection Projects, Various Routes
Infrastructure
Results
Less than $300,000 est. value

Last Updated 11/04/2022 02:44 AM
Project Title

RFQ - Various Phase I/II and/or III Materials Quality Assurance Testing and Inspection Projects, Various Routes

Physical Address View project details and contacts
City, State (County) Collinsville, IL 62234   (Madison County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Job No. MT-98-001-22, Various Phase I/II and/or III Materials Quality Assurance Testing and Inspection Projects, Various Routes, Various Counties, Region Five/District Eight. This project requires 27% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 4, 2022, at 11:00 AM at the Region Five/District Eight Office in Collinsville. Phase I/II and/or III engineering services are required to provide qualified staff to supplement the District Eight Laboratory, perform the quality assurance responsibilities of hot-mix asphalt (HMA), Portland cement concrete (PCC) construction, and the Aggregate Gradation Control System (AGCS). Additional services and responsibilities may include inspection of pipe and precast products, soils testing and miscellaneous materials inspection at various sources or jobsites. Work orders under the blanket agreement will be negotiated and authorized by the department on an as-needed basis. The estimated engineering fee for this project is $500,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Location Design Studies (Reconstruction/Major Rehabilitation) Highways (Roads and Streets) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 042 - RFQ - Various Phase I/II and/or III Materials Quality Assurance Testing and Inspection Projects, Various Routes

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents