Similar Projects
Commerce Parkway, Arvin Road and Hurricane Street Intersection Improvements
Post-Bid
Franklin, IN 46131

Road Paving and Repair
Post-Bid
Princes Lakes, IN

CR 525 East Roadway Improvements
Results
Franklin, IN 46131

Intersection Improvement, Roundabout
Results
IN

Jim Black Road Phase I Roadway Improvements
Post-Bid
Franklin, IN 46131

Road Reconstruction
Results

2021 Asphalt Conversion
Post-Bid
IN

2020 CCMG - Full Depth Reconstruction - Pavement Replacement
Results
Greenwood, IN

South State Street Improvements
Post-Bid
$150,000 est. value
Franklin, IN 46131

Intersection Improvement
Results
IN

Alley Improvements
Post-Bid
Franklin, IN 46131

Walnut Street Roadway Improvements
Results
Edinburgh, IN 46124

2021 Annual Paving
Post-Bid
Greenwood, IN

2021 Street Improvement Program
Results
Bargersville, IN

2021 Maintenance Improvement Program; Mill and Overlay
Post-Bid
Franklin, IN

Last Updated 04/21/2022 06:47 AM
Project Title

Miscellaneous School Projects

Physical Address View project details and contacts
City, State (County) Greenwood, IN 46143   (Johnson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The projects consist of the construction of a parking lot off Morgantown Road for the Center Grove Soccer Field. The parking lot includes underground detention, curbs, full depth pavement, landscaping, and ditch reroute. Reconfiguration of the circle at the Southeast side of Honey Grove. This involves removal of an existing roadway, pavement markings, sidewalk, and curb and reinstalling. Also the widening of Pennington Roadway from Morgantown Road to the East side of Hornaday Drive. This project will widen the road 8 feet to the North while constructing a roundabout, milling & surfacing the existing roadway, and full depth pavement in the project limits. Pennington improvements also includes storm water improvements involving new storm structures, concrete ditches, and curb and gutter. Saddle Club Road improvements that include widening of the existing roadway, mill & resurface, stone shoulders, and construction of a drive. All work is specified in the Construction Schedule and Specifications for said project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents