Similar Projects
Excavation Work for Gateway Preparatory Academy
Infrastructure
Design
$130,000 CJ est. value
Enoch, UT 84721

Brian Head Town Trail Phase 3 Project
Infrastructure
Design
$80,000 CJ est. value
Brian Head, UT 84719

Frontier Homestead Museum Area Painting and Grounds Improvements
Infrastructure, Renovation
Bidding
$295,000 CJ est. value
Cedar City, UT 84721

Frontier Homestead Museum Area Painting and Grounds Improvements
Infrastructure, Renovation
Bidding
$295,000 CJ est. value
Cedar City, UT 84721

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Results

SR -14 Woods Ranch EB Passing Lane
Infrastructure
Results
$1,500,000 to $3,000,000 est. value
UT

Toboggan Lane and Snowman Drive Waterline Project
Infrastructure
Design
Brian Head, UT 84719

Snowshoe and Toboggan Waterline Project
Infrastructure
Post-Bid
Brian Head, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Canyon Sewer Line Capacity Project
Infrastructure
Design
$500,000 CJ est. value
Brian Head, UT 84719

Forest and Falcon Waterline Project
Infrastructure
Post-Bid
Brian Head, UT

SR-14 SR-148 to Mammoth Crk Rd and MP 36.8 to US-89
Infrastructure
Results
$6,000,000 to $10,000,000 est. value

Paved Town Trail Phase III
Infrastructure
Post-Bid
Brian Head, UT

Last Updated 01/27/2023 05:31 PM
Project Title

Thunderbird Way Storm Drain / ADA Sidewalk Project

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84720   (Iron County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,654,278 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project will install underground storm drain including manholes on 800 W from 200 Nto 200 S, and on 200 S from 800 W to 500 W. The storm drain will help direct storm water runoff around the SUU campus. The project will also replace curb gutter and sidewalk on the north side of 200 S from 700 West to 450 West.. Construction Cost Estimate: $1,675,000.00 Question Deadline 01/16/2023 at 3:00 PM MT

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents