Similar Projects
Meijer Main Store And Convenience / Fuel Center
New Construction - 162,640 SF
Conception
$10,000,000 CJ est. value
Madison, WI 53719

Meijer Main Store And Convenience / Fuel Center
New Construction - 162,640 SF
Conception
$10,000,000 CJ est. value
Madison, WI 53719

Roundy's Groceries #406-01
Renovation
Design
Schofield, WI 54476

Kwik Trip
New Construction
Design
Sheboygan, WI

Target #1212 - Grocery Pick-UP
Renovation - 500 SF
Post-Bid
Grafton, WI 53024

Roundy's #352-01
Renovation - 45,000 SF
Post-Bid
Waupaca, WI 54981

Roundy's Groceries #101-05
Renovation
Results
Plover, WI 54467

Lou Perrine's Convenience Store
New Construction, Renovation
Construction
Kenosha, WI 53143

Lou Perrine's Convenience Store
New Construction, Renovation
Construction
Kenosha, WI 53143

National Food Market
New Construction - 3,346 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Milwaukee, WI 53215

The Village At Fox River
New Construction
Pending Verification
Waukesha, WI

KJS C-Store
New Construction - 5,727 SF
Design
$5,000,000 est. value
Kenosha, WI 53142

Kwik Trip #597
New Construction - 13,000 SF
Post-Bid
Somers, WI 53177

Grocery & Liquor Store
New Construction
Construction
$60,400 est. value
West Allis, WI 53227

Mini Mart
Renovation - 1,000 SF
Pending Verification
Madison, WI 53713

Last Updated 10/05/2021 04:30 PM
Project Title

Circle K - Ledgeview

Physical Address View project details and contacts
City, State (County) De Pere, WI 54115   (Brown County)
Category(s) Commercial
Sub-Category(s) Gas Station, Supermarket/Convenience Store
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced first quarter 2021, Construction Completion Expected November 2021
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Gas station will also include a convenience store.

Details

Gas Station, 1 Story Above Grade, 12,733 SF New Construction, Supermarket/Convenience Store, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents