Similar Projects
Managed Parking
Post-Bid
Green Mountain Falls, CO

2020 CDBG Prado Dr and Downtown ADA Improvements
Post-Bid
Fountain, CO 80817

Ada Curb Ramp Retrofit Upgrades, including Removal of Sidewalk
Results
$1,000,000 to $5,000,000 est. value

Upper Meadows Trail Project
Results
Less than $40,000 est. value
Colorado Springs, CO

Sidewalk and Drainage Improvements on El Monte Place
Infrastructure
Post-Bid
Manitou Springs, CO 80829

FCF ADA Improvements - Phase 1
Results
Less than $1,500,000 est. value
Colorado Springs, CO

2021 CDBG Southmoor Drive ADA Sidewalk Improvements Project
Infrastructure
Post-Bid
Fountain, CO 80817

Old Broadmoor and Lake Roundabout Modification
Results
Colorado Springs, CO

PikeRide Expansion Construction Project
Infrastructure
Post-Bid
$200,000 est. value
Colorado Springs, CO

Sidewalk Improvements on Canon and Park Avenue
Results
Manitou Springs, CO 80829

ADA Improvements at Sertich Ice Center
Infrastructure
Post-Bid
$100,000 est. value
Colorado Springs, CO 80909

ADA Accessibility Improvements at the El Paso County Fairgrounds
Results
Less than $138,800 est. value
Calhan, CO 80808

Pike Ride Expansion Project
Infrastructure
Post-Bid
$50,000 est. value
Colorado Springs, CO

North Cheyenne Canon Powell Trailhead Parking Lot Construction
Results
Less than $320,000 est. value
Colorado Springs, CO

Amphitheater Parking Lot - Cheyenne Mountain State Park
Infrastructure
Post-Bid
$400,000 est. value
Colorado Springs, CO 80926

Last Updated 06/13/2022 02:00 AM
Project Title

Sand Creek Trail Crossing at Hancock

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80902   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000 to $850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a signalized crossing for the Sand Creek Trail, where the trail crosses Hancock Expressway. This project will also be constructing a portion of new concrete trail along the Sand Creek Trail Corridor to the north of the proposed signalized crossing. This project is a cooperative effort between Traffic Engineering, Storm water Enterprise and PRCS. The work to be done by the Contractor shall consist of work associated with the installation of a new signalized trail crossing. The work includes, but is not necessarily be limited to, removal and replacement of sidewalks, removal and installation of new concrete trail, street crosspans, pedestrian ramps, curb and gutter, patterned concrete; addition and modification of drainage structures; asphalt patching; and installation of signal equipment to include electrical conduit and wires to power the proposed signals. This work shall include restoration of all areas disturbed by the construction activities to a condition equal to or better than the pre-construction condition, and the protection or replacement of fencing, retaining walls, landscaping, removal of obstructions, minor utility relocation and/or adjustment, grading, soil scarification, moisture control and backfill & compaction. This work shall also include the disposal of surplus or waste materials and traffic control/ barricading required for this work. The Contractor shall obtain all permits and furnish all transportation, materials, tools, equipment, labor and supplies necessary to complete in a workmanlike manner the improvements as shown and specified in these documents prepared by Felsburg, Holt & Ullevig for PRCS. Pre-Bid Meeting Microsoft Teams details: For meeting click at https://teams.microsoft.com/l/meetup-join/19%3ameeting_MmQwMGY1MzAtOTAwYS00YTY1LTlhMTMtYmRmZjgwMWI1YjI4%40thread.v2/0?context=%7b%22Tid%22%3a%2290f74bf0-a593-4c12-9591-fb8ef4ba6ad1%22%2c%22Oid%22%3a%22dc36abda-78bf-461c-a321-a528ac3cb37a%22%7d Or call in (audio only) +1 720-617-3426,,643468840# Phone Conference ID: 643 468 840#

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents