Similar Projects
Walk-in Refrigerator Replacement Memorial Middle School/High School
Renovation
Sub-Bidding
$80,000 CJ est. value
Elmwood Park, NJ 07407

Unit Ventilator Replacement Brookside Elementary School
Renovation
Sub-Bidding
$400,000 CJ est. value
Westwood, NJ 07675

2021 Hvac Modifications
Term Contract
Post-Bid
Wyckoff, NJ 07481

Fanny M. Hillers School - Rooftop Unit Replacement
Alteration
Post-Bid
Hackensack, NJ 07601

HVAC Renovations at the Franklin Elementary School and Helen I. Smith Elementary School
Results
$500,000 est. value
Saddle Brook, NJ 07663

HVAC Replacement at Elmwood Park BOE Administration Office
Alteration
Results
Elmwood Park, NJ 07407

Westwood High School Auditorium HVAC Replacement Project
Renovation
Sub-Bidding
$800,000 CJ est. value
Township of Washington, NJ 07676

Heating, Ventilating, and Air Conditioning Service and Repair
Term Contract
Post-Bid
Fort Lee, NJ

Installation of Senior Center HVAC
Alteration
Results
Moonachie, NJ 07074

HVAC Maintenance and Repair
Term Contract
Sub-Bidding
Fair Lawn, NJ 07410

Fort Lee School 1 HVAC VRF Installation
Alteration
Post-Bid
Fort Lee, NJ 07024

Gymnasium HVAC Upgrades
Alteration
Results
Englewood, NJ 07631

RTU Replacement at School #6
Renovation
Sub-Bidding
$800,000 CJ est. value
Cliffside Park, NJ 07010

Annual HVAC Maintenance
Infrastructure, Alteration
Post-Bid
Ridgewood, NJ 07450

Rooftop HVAC Replacement at Woodside Elementary School
Alteration
Results
River Vale, NJ 07675

Last Updated 04/10/2023 09:13 AM
Project Title

Parsons Pond Park MultiPurpose Building Replacement of HVAC Ductwork

Physical Address View project details and contacts
City, State (County) Franklin Lakes, NJ 07417   (Bergen County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $96,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

f, through any cause, the contractor shall fail to fulfill in a timely and proper manner obligations under the contract or ifthe contractor shall violate any ofthe requirements ofthe contract, the owner shall there upon have the right to terminate the contract by giving written notice to the contractor of such termination and specifying the effective date of termination. Such termination shall relieve the owner of any obligation for balances to the contractor of any sum or sums set forth in the contract. Owner will pay only for goods and services accepted prior to termination

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents