Similar Projects
109th Avenue Roadway Improvements - Village of Pleasant Prairie
Infrastructure
Conception
$500,000 est. value
Pleasant Prairie, WI 53158

21st Avenue and 42nd Street Resurfacing
Post-Bid
Kenosha, WI

Repaving 308th Avenue
Post-Bid
$234,000 est. value
Kansasville, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Dump Station Reconfiguration/Relocation GPC
Renovation
Results
Kansasville, WI

2021 Village Seal Coating Program
Infrastructure
Post-Bid
Salem, WI

Lake Geneva - Kenosha, CTH O - STH 75, 236th Avenue - 125th Avenue
Results
Kenosha, Lake Geneva, WI

2022 Paving Program Utility Adjustment and Curb Repair
Infrastructure
Post-Bid
WI

2021 Paving Program Phase 1
Results
Pleasant Prairie, WI

2022 Paving Program Phase 1
Term Contract, Infrastructure
Post-Bid
Pleasant Prairie, WI 53158

2021 Paving Program - Phase II
Results
$480,000 est. value
Pleasant Prairie, WI

54th Avenue and 56th Avenue Resurfacing
Infrastructure, Alteration
Post-Bid
$400,000 est. value
Kenosha, WI

18th Avenue Reconstruction - 18th Street to Madison Road
Renovation
Results
Kenosha, WI 53140

Joint, Crack Cleaning and Sealing
Infrastructure
Post-Bid
$120,000 est. value
Kenosha, WI

2021 Street Improvements
Results
Salem, WI

Last Updated 06/16/2022 07:56 AM
Project Title

Roadwork - Repaving 41st Street

Physical Address View project details and contacts
City, State (County) WI   (Kenosha County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $234,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repaving 41st Street beginning at the intersection with 308th Avenue and continuing east through the intersection of CTK "B" to Town Road (2.02 miles). Also, repaving Town Road from its beginning (approximately .75 miles east of CTK "B" (288th Ave) ) to its end at CTK "NN" (52nd St) (1.22 miles) Brighton also requests a break out of work area divided into 2 sections (approx. 1.25 miles 308th Ave to CTK "B" AND approx. 1.97 miles CTK "B" to CTK "NN")The project is to include the following: - Pulverize to a depth of 6 inches; fine grade and compact existing asphalt pavement to utilize as base for a new pavement cross-section. - Undercut one foot below sub grade any areas that fail during proof roll - Geo grid to be placed with 3 inch stone with 1.25 inch TB top coat to sub grade - Construct a two-course 3.5 inch asphalt pavement in the roadway area above consisting of a 2 inch binder course and a 1.5 inch surface course. - Provide tack coat between lifts of asphalt. - Install a one foot wide and 4 inch depth, limestone shoulder on each side of the new roadway. - Paint 4" yellow centerlines (passing and no passing zones as current) and 4" white shoulder striping

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents