Similar Projects
Demolition Of 6 Properties
Results
Jackson, MI

Demolition of House at 207 South Gorham
Demolition
Results
Jackson, MI 49201

Demolition of 112 East Mason Street
Demolition
Results
Jackson, MI 49203

2020 Demolition of House and Garage at 217 West Mason
Results
Jackson, MI 49201

Demolition of 323-327 West Trail
Demolition
Results
Jackson, MI 49201

Demolition of 139 Wall Street
Demolition
Results
Jackson, MI 49203

Demolition Of Five (5) Properties
Results
Jackson, MI

Demolition of 506 South Pleasant
Demolition
Results
Jackson, MI 49203

Demolition of a Commerical Structure at 810-818 Greenwood Avenue
Results
Less than $46,200 est. value
Jackson, MI 49203

2020 Demolition of 402-404 West Franklin Street
Demolition
Results
Less than $54,950 est. value
Jackson, MI

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Demolition of 401 and 405 Summit Avenue
Results
Jackson, MI 49201

Demolition of 1604 Merriman
Results
Jackson, MI 49203

Demolition of 921 Everhard Streeet
Demolition
Results
Jackson, MI 49203

2021 Demolition of 1612-1614 Chapin
Post-Bid
Jackson, MI

Last Updated 05/11/2020 12:02 PM
Project Title

Demolition of 1613 Chlebus Street

Physical Address View project details and contacts
City, State (County) Jackson, MI 49203   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1) Hazardous materials must be abated in accordance with MIOSHA and DEQ regulations and the attached Pre-Demolition Compliance Survey assessment. 2) Compact all clean backfill material with a hoe-pack or vibrating roller compactor. 3) Remove _ _0__ curb(s) cut(s) and entry approach(s). (_ 0_ lineal feet ) 4) Install _ __0_ lineal feet of curb and gutter. 5) Remove and replace _ 0 _of cracked, heaved and broken public sidewalks. 6) See enclosed water and sewer service records for approximate location and any special instructions for shared services. If no service card is provided it is the contractor’s responsibility to insure that neighboring water and sewer services are operational at the conclusion of the demolition. 7) Trees/shrubs: Remove all shrubs, small trees from around home. Remove all stumps, and logs. Tree stump N and next to propane tank. Remove small pine from N. 8) Miscellaneous: Remove concrete blocks, concrete walls and former garage foundation from E yard area. Remove septic tank and drainfield if found adjacent to home Home not on City sewer system. Remove and dispose of propane tank. Remove light pole and light. Remove clothes lines and poles to N. Remove any all hard surfaces from property area and grade full site to blend with surrounding yard areas.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents